Laserfiche WebLink
13, The cut volume stated on page 2.05-5a for the rock dust tank area <br />(17,500 cyyds) conflicts with the value used (13,013 cyds) in the bond <br />calculations on page EX. 28-153. Please correct this discrepancy and <br />resubmit materials as necessary. <br />14. The light use road as it approaches the C & W roundhouse leaves the <br />mine surface disturbance area, then starts again on the west side of <br />the building. Please refer to Map 11, 2008 version for a correct <br />depiction of the road network in this area. Map 11 Sheet 1 should be <br />corrected in this area to only show mine roads where they exist within <br />the boundaries of the surface disturbance area as shown on Map 11 <br />Sheet 3. It may be beneficial to include the surface disturbance <br />boundary on Map 11 Sheet 1. Additionally, the surface disturbance <br />boundary appears incorrect at the RDA. Please review and correct <br />as necessary. <br />15. NECC has provided detailed descriptions and plans of the proposed <br />facilities in Exhibit 28 as requested. On page 147 of Exhibit 28 NECC is <br />providing information regarding the slope track system. In the brief <br />text portion NECC describes the slope track system in the first and <br />fourth sentences. The second and third sentences, however, partially <br />describe the two new water tanks that are described on page 144 of <br />Exhibit 28. Please correct the text description of the slope track <br />system on page 147 of Exhibit 28 to include all of the necessary <br />information regarding the system. Please remove the erroneous <br />references to the proposed water tanks in the second and third <br />sentences of the text. Please submit three copies of revised page 147 <br />of Exhibit 28 for review. <br />16. NECC has provided a detailed reclamation cost estimate for <br />Technical Revision 54 in Exhibit 28, beginning on Page 129. In the first <br />paragraph on page 129, NECC lists the new structures that are <br />included in this estimate. Included in this list are the central pumping <br />station building, the sewage plant building and the water pipe vaults. <br />NECC has also provided a list of all of the surface facilities in Table 19 <br />(on permit page 2.05-6). The central pumping station building, the <br />sewage plant building and the water pipe vaults are not included in <br />Table 19. Please amend Table 19 on permit page 2.05-6 to include <br />the central pumping station building, the sewage plant building and <br />the water pipe vaults. Please submit three copies of revised Table 19 <br />for review.