My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-03_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2010-12-03_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:34 PM
Creation date
12/6/2010 8:36:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
12/3/2010
Doc Name
Review Letter
From
DRMS
To
New Elk Coal Company
Type & Sequence
TR54
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. One water tank appears to have been added to Table 19 but two <br />are discussed in the cover letter. Please ensure that Table 19 clearly <br />identifies each water tank by size or volume. <br />NECC Response: Permit text on page 2.05-5a and Table 19 have <br />been revised. <br />DBMS Response: Response accepted. However, there is a text error <br />on revised permit page 2.05-5a. The last sentence in the third full <br />paragraph (paragraph beginning "A ditch is proposed to route...") <br />reads "The detailed design in included as an addendum..." The <br />word "in" should be "is", so the sentence will read "The detailed <br />design is included as an addendum..." Please correct the text in the <br />final sentence of the third full paragraph on revised permit page 2,05- <br />5a, changing the word "in" to "is", as noted above. Please submit <br />three copies of revised page 2.05-5a for review. <br />7. The central pumping station building and the rock dust pressure <br />vessel described in the cover letter is not listed in Table 19. Please <br />add this structure to Table 19, <br />NECC Response: The central pumping station is removed from <br />consideration under TR-54 and the compressor and pressure vessel <br />building has been added to Table 19. <br />DBMS Response: Response accepted. <br />8. Please expand the permit narrative discussion of the electrical <br />power distribution upgrade. Include substation changes or <br />additions power pole locations or line locations with the number of <br />poles added per line. If the power company owns the poles and <br />the poles will remain after reclamation, please include a letter from <br />the power company stating that the poles belong to them and will <br />remain when the site is reclaimed. <br />NECC Response: Text has been added/revised to discuss power <br />distribution on the mine site. Power facilities on the mine property are <br />owned by the mine. <br />DBMS Response: Please add ownership information to Map 11 Sheet <br />2 and/or Table 19, if necessary, to clearly indicate any power lines <br />shown on the map that are not owned by the mine. Please also refer <br />to question # 17 below.
The URL can be used to link to this page
Your browser does not support the video tag.