Laserfiche WebLink
• Table IA-8. Summary of topsoil replacement Costs <br />Fleet Description <br />• <br />• <br />Revision: ,?2 -Ct, <br />1 -42 <br />Approved: <br />- - - "— "— <br />Units <br />Own Cost <br />Op 6 OH <br />Operator <br />Cost ea. <br />Total Cost <br />Equipment <br />R equir ed <br />ea ($/hr) <br />ea ($/hr) <br />($llrr) <br />("r) <br />($/hr) <br />Cat 637G (single shift) <br />$ 313.18 <br />$ 2,505.44 <br />Cat 16H <br />�_ <br />°- -`_ <br />5 __ �_ <br />:. — - <br />$ 144.64 <br />$ 144.64 <br />Cat D10R <br />0 <br />1. , . <br />5 1 34 13 <br />S 78 <br />$ 237.30 <br />$ 118.65 <br />Water Truck <br />-- <br />- " <br />3473 <br />$ ?3 54 <br />$ 90.56 <br />$ 67.92 <br />Total <br />$ 254.30 <br />$ 415.24 <br />$ 116.14 <br />$ 2,836.65 <br />Production <br />Fleet <br />Cubic <br />Rate <br />Scraper <br />Fleet <br />Cost <br />Total <br />Area <br />Yards <br />(cydsRu) <br />Hours <br />Hours <br />($/hr) <br />($) <br />Ash Dump <br />401,523 <br />209 <br />1920 <br />240.0 <br />$ 2,836.65 <br />$ 680,849 <br />D/E Pit <br />488,686 <br />169 <br />2899 <br />362.4 <br />$ 2,836.65 <br />$1,027,909 <br />Z Pit <br />226,652 <br />122 <br />1856 <br />232.0 <br />$ 2,836.65 <br />$ 658,073 <br />F Pit <br />89,958 <br />110 <br />815 <br />101.8 <br />$ 2,836.65 <br />$ 288,868 <br />G Pit <br />1,064,040 <br />184 <br />5796 <br />724.4 <br />$ 2,836.65 <br />$2,054,987 <br />AE Pit <br />210,251 <br />154 <br />1369 <br />171 <br />$ 2,836.65 <br />$ 485,398 <br />West Panel <br />288,235 <br />176 <br />1634 <br />204.3 <br />$ 2,836.65 <br />$ 579,495 <br />East Panel <br />504,918 <br />156 <br />3235 <br />404.4 <br />$ 2,836.65 <br />$1,147,211 <br />Sub Total <br />3,274,263 <br />168 <br />19524 <br />2440.5 <br />$ 2,836.65 <br />$6,922,789 <br />• <br />• <br />Revision: ,?2 -Ct, <br />1 -42 <br />Approved: <br />- - - "— "— <br />