Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 273 State : Colorado Permit/job# : C -1981 -038 <br />Date : 0912912010 County : Delta Abbreviation : none <br />User: JRS Site : Bowie No. 1 Mine Filename : CO38 -273 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Minor Revision 125 <br />Task description : Regrade Light -Use Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume: 2.660 <br />Basic machine Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade type Semi - Universal <br />0.75 <br />(a vg.) <br />Material consistency: <br />Attachment no. 1 : ROPS Cab <br />(Cat HB) <br />Shift basis: <br />1 per day_ <br />Attachment no. 2 : -shank ripper <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />0.83 <br />Data source : <br />(CR_G_ )_ <br />0.80 <br />Utilization % <br />Push gradient: <br />0.90 <br />Ownership cost/hour: $67.77 <br />NA <br />1.00 <br />(Cat H <br />Operating cost/hour : $95.29 <br />100 <br />(_Ca H <br />Blade type : <br />Ripper op. cost/hour : $0.00 <br />0 <br />Net correction : <br />0.32 <br />Operator cost/hour : $38.54 <br />NA <br />292.33 <br />LCY /hr <br />Total unit cost/hour : $201.60 <br />Total <br />fleet cost/hour : <br />$201.60 <br />10.24 <br />Swell <br />Loose <br />$2,064 <br />CCY factor : 1.125 <br />volume : <br />2,992 <br />LCY <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: 5.00 % (1 <br />Average site altitude : 7,500 feet <br />Material weight: Z900 <br />Weight description : <br />Decomp rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost: $0.690 /LCY <br />Ibs /LCY <br />Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(a vg.) <br />Material consistency: <br />0.90 <br />(Cat HB) <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />0.83 <br />(_1_shift1da_y) <br />Spoil pile: <br />0.80 <br />(f -r <br />Push gradient: <br />0.90 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat H <br />Material weight: <br />0.79 <br />(_Ca H <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.32 <br />Adjusted unit production : <br />292.33 <br />LCY /hr <br />Adjusted fleet production : <br />292.33 <br />LCY /hr <br />Total job time : <br />10.24 <br />Hours <br />Total job cost: <br />$2,064 <br />