Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 272 <br />Date : 0912912010 <br />User: JRS <br />Permit/job# : C -1981 -038 <br />Abbreviation : none <br />Filename : CO38 -272 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Minor Revision 125 <br />Task description : Regrade Drill Pads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Initial <br />volume: 4.840 <br />CIRCES Cost Estimatinsa Software <br />BULLDOZER WORK <br />State : Colorado <br />County : Delta <br />Site :Bowie No. 1 Mine <br />Basic machine : Cat D9R - 9SU (2005) <br />Horsepower: <br />40 <br />Blade type Semi - Universal <br />0.75 <br />(a vg.) <br />Attachment no. 1 : ROPS Cab <br />0.90 <br />Shift basis: <br />1 per day <br />Attachment no. 2 : 3-shank ripper <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />Data source : <br />(CRG) <br />Job efficiency: <br />Utilization % <br />(1 shi <br />Ownership cost/hour: $67.77 <br />NA <br />(fnd - rt) <br />Operating cost/hour: $95.29 <br />100 <br />(Cat HB) <br />Ripper op. cost/hour : $0.00 <br />0 <br />(Cat H B) <br />Operator cost/hour: $38.54 <br />NA <br />( H <br />Total unit cost/hour : $201.60 <br />Total <br />fleet cost/hour: <br />$201.60 <br />Net correction : <br />Swell <br />Loose <br />Adjusted unit production : <br />CCY factor : 1.125 <br />volume: <br />5,445 <br />LCY <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY /hr <br />Material consistency description <br />Compac fill or embankment <br />Average push gradient: 5.00 % (I <br />Average site altitude : 7,500 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.690 /LCY <br />Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(a vg.) <br />Material consistency : <br />0.90 <br />(Cat HB) <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />0.83 <br />(1 shi <br />Spoil pile: <br />0.80 <br />(fnd - rt) <br />Push gradient: <br />0.90 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat H B) <br />Material weight: <br />0.79 <br />( H <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.32 <br />Adjusted unit production : <br />292.33 <br />LCY /hr <br />Adjusted fleet production : <br />292.33 <br />LCY /hr <br />Total job time : <br />18.63 <br />Hours <br />Total job cost: <br />$3,755 <br />