My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-30_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2010-09-30_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:59 PM
Creation date
11/26/2010 12:59:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
9/30/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Reclamation Cost Estimate MR125
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 274 State : Colorado Permit/job# : C -1981 -038 <br />Date : 0912912010 County : Delta Abbreviation : none <br />User: JRS Site Bowie No. 1 Mine Filename : CO38 -274 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />504.38 LCY /hr <br />Permit or other job action : Minor Revision 125 <br />Operator skill : <br />Task description : Replace Topsoil from Stockpile to Drill Pads <br />7.20 Hours <br />Material consistency: <br />HOURLY EQUIPMENT COST <br />(Cat HB) <br />Basic machine: Cat D9R - 9SU (2005) Horsepower: <br />40 <br />Blade type Semi - Universal <br />Visibility: <br />Attachment no. 1 : ROPS Cab Shift basis: <br />1 per day <br />Attachment no. 2 : -shank ripper <br />0.83 <br />Data source : <br />(C_ RG) <br />0.80 <br />Utilization % <br />Push gradient: <br />Cost Breakdown : Ownership cost/hour : $67.77 <br />NA <br />Altitude : <br />Operating cost/hour : $95.29 <br />100 <br />Material weight: <br />Ripper op. cost/hour : $0.00 <br />0 <br />Blade type : <br />Operator cost/hour : $38.54 <br />NA <br />Net correction : <br />Total unit cost/hour : $201.60 Total fleet cost/hour :' <br />$201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,230 CCY factor : 1.125 volume <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 5.00 % (pos) <br />Average site altitude : 7,500 feet <br />Material weight: Z 550 Ibs /LCY <br />Weight description <br />Earth - D ry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost: $0.400 /LCY <br />3,634 LCY <br />Job Condition Correction Factors <br />504.38 LCY /hr <br />Source <br />Operator skill : <br />0.75 <br />7.20 Hours <br />Material consistency: <br />1.00 <br />(Cat HB) <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />( avg.) <br />Job efficiency: <br />0.83 <br />(1sh <br />Spoil pile: <br />0.80 <br />(fnd -rt) <br />Push gradient: <br />0.90 <br />(Cat HB_) <br />Altitude : <br />1.00 <br />(Cat HB_) <br />Material weight: <br />0.90 <br />(_C HB <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.41 <br />Adjusted unit production : <br />504.38 LCY /hr <br />Adjusted fleet production : <br />504.38 LCY /hr <br />Total job time : <br />7.20 Hours <br />Total job cost: <br />$1,452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.