Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ GEC BOND FORFEITURE I I Permit C-$1-037 Field Visit 08/10/2010 Continuation Page <br />Percnn Number _ Date <br />28. Performance Standard Categories <br />Codes: ]=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. Administrative D. Bacl:filling & Grading H. Subsidence Control Plan <br />1. _ Mining within Valid Permit 1._ Exposed Openings I. _ <br />Roads <br />2 Minim, within Bonded Area Contemporaneous Reclamation I . Road Road Construction <br />3. _ Terms & Conditions of Permit 3,_ Approximate Original Contour 2 <br />Certification <br />4. _ Liability Insurance 4. - Highwall Elimination _ <br />3. <br />Drainage <br />5. _ Ownership and Control 5. - Steep Slopes (includes downslope) _ <br />4. Surfacing and Maintenance <br />6. _ Temporary Cessation 6. Handlim, of Acid & Toxic Materials 5, Reclamation <br />7. _ AML Rec. Fees -- Non-Respondent 7.- Stabilization (rills and gullies) J. Signs & Markers <br />8. _ AML Rec. Fees -- Failure to Pay . E. Excess Spoil Disposal 1. Signs <br />B. Hydrologic .Balance 1. Placement 2. Markers <br />1. Drainage Control 2 _ Drainage Control K. Distance Prohibitions <br />Inspections & Certifications <br />2 3.- Surface Stabilization L. _ <br />Revegetation <br />_ <br />3. Siltation-Structures 4.- Inspections & Certifications I 1 Vegetative Cover <br />4. Discharge Structures F. Coal Mine Waste <br />2. 1 Timing <br />5. Diversions (Refuse Piles/Impoundments) M. 1 Postmining Land Use <br />6. Effluent Limits 1. Drainage Control - <br />Ground Water Monitoring <br />7. 2. Surface Stabilization N. Other <br />Surface Water Monitoring <br />- <br />8. 3. Placement General <br />9. Drainage -- Acid-Toxic Materials <br />- 4._ Inspections and Certifications Performance <br />10. Impoundments 5. Impounding Structures Catagory <br />11. Stream Buffer Zones G. Use Of Explosives 1) <br />C. Topsoil & Subsoil - <br />l.- Blaster Certification - <br />I . Removal 2. - Distance Prohibitions ?) <br />2. Substitute Materials - <br />3._ Blast Survey/Schedule - <br />3. Storage and Protection 4.- Warnings & Records 3) <br />4. Redistribution 5._ Control of Adverse Effects - - <br />Performance Standard Catago ries E. Excess Spoil Disposal ......... ..................................(816/817.71-74) <br />30 CFR Counterpart 1. Placement .................................. .........................................................71(e) <br />71(f) <br />A. Administrative ......................................................................... 2 Drainage Control ..................... <br />.......... <br />1 Surface Stabilization .......................................................... <br />........................................................... 71(g) <br />1. Valid Permit ..................... <br />2. Mining within Bonded Area ........................ ...... <br />773.11 <br />........................773.1] 4. Inspections & Certifications..... .......................................................... 71 <br />3. Terms & Conditions of Permit ..................... ........................773.17 F. Coal Mine Waste (Refuse Pi les/Impoundments) ,,,,,(816/817.81-84) <br />4. Liabilitv Insurance ................................................................800.60 <br />5. Ownership and Control ................................................... .778.13 ' Drainage Control ..................... <br />i <br />..........................................................83(a) <br />83(b) <br />6. Temporary Cessation ..............................842 on ................ <br />.11(e) & 816/817.131 2. Surface Stabilizat <br />........ <br />. <br />Placement <br />3 .......................................................... <br />......................................................... 83(c) <br />7. AML Rec. Fees -- Non-Res,pondant ............. . <br />....................... <br />. <br />...................870.15(b) <br />4. Inspections and Certifications.. ......................................................... 83(d) <br />8. AML Rec. Fees -- Failure to Pa} ................... ...................870.15(a) <br />5. Impounding Structures ............. ..............................................................84 <br />B. Hydrologic Balance ................................ ......(816/817.41-57) G. Use of Explosives ............... ................................... (816/817.61-68) <br />1. Drainage Control ........................................................................45 <br />2. Inspections &Certifications .............................................49(a)(10) ? <br />Prohibitions <br />Di <br />t <br />............61( ) <br />3. Siltation Structures ....................................... ............................................................ <br />s <br />. <br />ance <br />..............................46 <br />47 3. Blast Survey/Schedule ....................................................................... 62,64 <br />4. Discharge Structures ................................... ................................ <br />43 4. Warnings & Records ............... .......................................................66 & 68 <br />5. Diversions .................................................... <br />.......... ...... .. ...... <br />............... <br />.. <br />Effluent Limits <br />6 ............................... <br />.................... 42 5. Control of Adverse Effects ...... <br />........... ............................................................... 67 <br />... <br />. <br />. <br />7. Ground Water Monitoring .......................... ...........................41(c) H. Subsidence Control Plan ......................................... (817.121-122) <br />8. Surface Water Monitoring ........................... ...........................41(e) I. Roads ................................................................. (816/817.150-151) <br />9. Drainage--Acid - Toxic Materials ................ ...........................41(f) <br />49 1. Road Construction ................... <br />........................................................ 150(c) <br />10. Impoundments ............................................. ............................... <br />57 2. Certification............................. <br />. ........................................................ 151(a) <br />11. Stream Buffer Zones .................................... .......... <br />.................... <br />3. Drainage .............. ..................... ...................................... ...... 150(b)-151(d) <br />C. Topsoil & Subsoil............. ....................... ............(816/817 22) 4. Surfacing and Maintenance ...... ............................................ 150(e)-151(d) <br />Removal ....................................................... <br />1 ...........................22(a) 5. Reclamation ............................. .........................................................150(f) <br />. <br />2. Substitute Materials ..................................... ............................22(c) J. Signs & Markers .............. .........................................(816/817.11) <br />3. Storage and Protection ................................. ............................22(c) 1 <br />....... <br />Sans 1 1(a),(b).&(c) <br />............................................. <br />4. Redistribuuon .............................................. <br />................................ <br />. <br />............................22(d) <br />2. Marlcers ................................... <br />..................:................1 1(a).(b):(d)>(e),&=(f) <br />D. Backflling &Grading ..............................(Sl6/817.95-107) K. Distance Prohibitions....................................................... (761.11) <br />1. Exposed Openings .....................816/817.13. 14, 15, & 823.11 & 21 L Revegetation..................... ................................ (816/817.111-116) <br />2. Contemporaneous Reclamation .................... <br />3. Approximate Original Contour ..................... ..............................100 <br />.....................102(a)(1) 1. Vegetative Cover..................... <br />.................................................. I I I & 116 <br />113 <br />4. Highwall Elimination .................................... ..................... 102(a)(2) 2. Timing ..................................... <br />107 <br />d U <br />L ............................................................. <br />133) <br />(816/817 <br />5. Steep Slopes (includes downslope) ............... ............................. <br />se....... <br />an <br />M. Postmining . <br />. <br />....................................... <br />6. Handling of Acid & Toxic Materials ............ ..........................102(c) <br />Pa <br />e 2 Of <br /> _____95(h) g <br />Revised December 4. 1998