Laserfiche WebLink
U. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br /> <br />Mine Site Evaluation <br />State Program <br /> <br />1. Perm ittee/P ?1'' . 9. Permit Number 10. Permit Type <br /> <br />GEC BOND FOR EITURE SITE C-81-037 NP <br />2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 08/10/2010 O? FYI <br />C/O DRMS 1313 SHERMAN ST ROOM 215 <br />City 4. State <br />3 mm - dd - yyy? <br />. 14. Permit Status 15. Site Status 16. Facility Type <br />Denver <br />1 CO <br />AB FR <br />5. Zip Code 6. Phone Number <br />17. OSM Office # 18. CCID # 19. Land Code <br />80203 (303) 866-3567 S <br />140 <br />7. Operator Name, if Different than Permittee <br />Count} Name <br />22 <br />State Abrev <br />A ID # 21 <br />H <br />S <br /> 20 . <br />. <br />. M. . . . <br />EORLEY <br />W <br />R <br />.- <br />. <br />- D CO FREMONT <br />8. Mine Name <br />23 <br />. AVS Permittee Entity ID Number 24 <br />. State Office <br /> GEC STRIP MINE <br /> <br /> <br />25. Hours 26. Signatur ock 27. Reviewing Official: <br />0.0 a. Permit Review )Ine/3 <br /> Signature: Signature: <br />0 b. Site Visit Time <br />17 <br />. Elizabeth Shaef ID # 377 <br />1! <br />g p / u <br />4 <br />6.0 c. Travel Time Printed Name: / <br />/ <br />Review Date: <br />mm - dd - yyyy <br />2.0 d. ReportWriting Date: 11/08/2010 Is Supplemental MSE Page Used YIN Y? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item.12 CCR.... Citizen Complaint Referral (non site visit) <br />Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />0xx <br />.... <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN. ...Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase 111 Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />ND <br />... <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />ro <br />ress <br />ite is in <br />f f <br />it <br />d <br />f <br />/ t <br />p <br />. <br />g <br />e <br />e <br />s <br />ion o <br />or <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816 <br />FR.. Forfeited and Reclaimed: Forfeiture <br />817 <br />131(b) <br />ot be <br />un <br />h <br />. <br />. <br />. <br />ave n <br />g <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />AN <br />.. <br />facility such as tipple or preparation plant P2.. Phase II Release: At least Phase 11 bond release WC.WiIdcat: Coal mining and reclamation <br />No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />NM <br />.. <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loadingg Facility and/or Tipple J.... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K.-Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a encv's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888,-734-3247). Revised December a, i?9s