My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-10_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2010-11-10_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:56:00 PM
Creation date
11/12/2010 9:22:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/10/2010
Doc Name
Response to completeness matters (CN-01)
From
R2Incorporated Environmental and Engineering Services
To
DRMS
Type & Sequence
CN1
Email Name
WHE
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May Day Idaho Mine Complex 112 (d) Permit Application <br />May Day No. 1 East is illustrated on Exhibit C-1 and Figure C-4 will be used to dispose <br />of Run of Mine rock from the May Day No. 1. The total affected lands including buffer <br />is 0.5 acres <br />May Day No. 2: a tract of land located in Section 28, T36N, RI I W, N.M.P.M., and <br />being more particularly described as follows: beginning at a point from which the W1/4 <br />corner of said Section 28 bears S 82°30' 14"W a distance of 2299. 7 feet, Thence, N a <br />distance of 380 feet, Thence E a distance of 380 feet, Thence S a distance of 380 feet, <br />Thence West a distance of 380 feet to the point of beginning and containing 3.3 acres <br />May Day No. 3 (Lamb): a tract of land in Section 28, T36N, R11 W, N.M.P.M. and <br />being more particularly described as follows: beginning at a point from which the W1/4 <br />corner of said Section 28 bears S 54°29'30"W a distance of 3850.1 feet, Thence, N a <br />distance of 370 feet, Thence E a distance of 370 feet, Thence S a distance of 370 feet, <br />Thence W a distance of 370 feet to the point of beginning and containing approximately <br />3.2 acres. <br />James M. Clements owns the following properties which are included as affected lands for <br />this permit application: <br />Idaho (former) Millsite: a tract of land beginning at Corner 1, from whence the SW 1/4 <br />corner of Section 28 T36N, RI 1W bears S 8°46'57"E. 4019.12 ft; Thence S 71° 30'W. <br />399.67 ft to Corner 2; Thence N 27°50' W. 46.20 ft to Corner 3; Thence N 14°42' W. <br />340.57 ft to Corner 4, from whence Corner 16 Golden Rule Pacer Survey #8824 bears S <br />24°05'41E. 2664.53 ft; Thence N 71°30'E 387.64 ft to corner 5; and Thence S 18030'E. <br />385.43 ft to Corner 1 the place of beginning. Total area of the Idaho (former) millsite is <br />3.1 acres. <br />PayDay (former) Millsite: a tract of land beginning at Corner 1 on line 14-15 <br />Survey#8824 Golden Rule Placer run at N. 14°20'22"W 39.65 ft from Corner 15, and on <br />the North boundary of the S.E. 1/4 of the N.W. 1/4 of Section 28 T36N, R11 W, N.M.P.M. <br />(a subdivision embraced in the M.L. Towne patented Homestead entry No 314) at <br />89°56'E. 107.04 ft to Corner 2, on the north boundary of the SE1/4 of the NW 1/4 Section <br />28 T36N R11 W, N.M.P.M. at 89°56'E 199.54 ft from the NW corner of said subdivision, <br />and on line 23 Survey no 18320 Idaho Mill Site N. 27°50' W 22.97 ft from corner no 2; <br />Thence N27°50W. 23.23 ft to Corner 3; Thence N14.42' W.340.57ft to Corner <br />4;identical with corner 4 MS 18320 Idaho Mill site; Thence N.71°30'E.189.80 ft to <br />Corner 5; Thence N 18°33'W. 712.38 ft to Corner 6; Thence S 78°06'E. 198.27ft to <br />Corner 7 (not set as this corner falls in the center of a wagon road 12 wide course N 20W <br />where it is impractical to maintain a corner monument); from whence USMM <br />Morovortaz Mountain Bears N 32°31'53"W. 894.72 ft; Thence S 10°13'55"E. 489.99ft to <br />Corner 9, identical with Corner 14 Survey 8824 Golden Rule Placer; and thence 508.71 ft <br />to Corner no 1, the place of beginning. Net area of the PayDay (former) Millsite is 5.1 <br />acres. <br />May Day Idaho Mine Complex 112(d) Permit Application <br />September 21, 2010 (Revised Oct. 22, 2010) <br />2
The URL can be used to link to this page
Your browser does not support the video tag.