My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-04_INSPECTION - C1981035
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981035
>
2010-11-04_INSPECTION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:31 PM
Creation date
11/8/2010 2:23:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
INSPECTION
Doc Date
11/4/2010
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
10/6/2010
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTEIR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ GRANDE CAC14E COAL Pen-nit C-035-81 Field Visit 10/06/2010 Continuation Page <br />-1 <br />Person Number Date <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. Administrative D. Backfilling & Grading H. Subsidence Control Plan <br />I . 1 Mining within Valid Permit I . Exposed Openings - <br />1. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1. 1 Road Construction <br />3. l Terms & Conditions of Permit 3, Approximate Original Contour 2. Certification <br />4. 1 Liability Insurance 4. Highwall Elimination ;. Drainage <br />5. 1 Ownership and Control 5. Steep Slopes (includes downslop e) 4. Surfacing and Maintenance <br />6. _ Temporary Cessation 6. Handling of Acid & Toxic Materials 5. Reclamation <br />7. _ AML Rec. Fees -- Non-Respondent 7. Stabilization (rills and gullies) J. Signs & Markers <br />8. AML Rec. Fees - Failure to Pay E. Excess Spoil Disposal 1. I Signs <br />B. Hydrologic Balance I ._ Placement 2. 5 Markers <br />1. 1 Drainage Control 2. Drainage Control Distance Prohibitions <br />K. <br />2. 1 Inspections & Certifications 3. Surface Stabilization _ <br />L. Revegetation <br />3. 1 Siltation Structures 4. Inspections & Certifications 1, Vegetative Cover <br />4. 1 Discharge Structures F. Coal Mine Waste 2. Timing <br />5. 1 Diversions (Refuse Piles/Impoundments) M. Postmining Land Use <br />6. 1 Effluent Limits 1. 1 Drainage Control - <br />7. 1 Ground Water Monitoring 2. 1 Surface Stabilization N. Other <br />8. Surface Water Monitoring 3. 1 Placement General <br />9. Drainage -- Acid-Toxic Materials 4. Inspections and Certifications Performance <br />10. 1 Impoundments 5. Impounding Structures Catagory <br />11. Stream Buffer Zones G. Use Of Explosives 1) <br />C. Topsoil & Subsoil 1.- Blaster Certification - <br />- <br />1. 1 Removal 2.- Distance Prohibitions 2) <br />2. 1 Substitute Materials 1Blast Survey/Schedule _ <br />- <br />1 1 Storage and Protection 4.- Warnings & Records 3) <br />A - D oa;..,...;1...«;..,, 5. Control of Adverse Effects - <br /> Performance Standard Catagories E. Excess Spoil Disposal ...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement .................................................................... .......................71(e) <br />A. Administrative ......................................................................... 2. <br />3 Drainage Control ........................................................ <br />........................................ <br />Surface Stabilization ........................71 <br />........................ 71(g) <br />1. <br />2. Valid Permit .......................... 773.11 <br />Mining within Bonded Area ................................................773.11 . <br />4. ........... <br />Inspections & Certifications........................................ ....................... 1 <br />3. Terms & Conditions of Permit .............. ...............................773.17 F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(816/817.81-84) <br />4. <br />5. Liability Insurance .................................. <br />Ownership and Control .......................... ...............................800.60 <br />................ .........778.13 <br />1. <br />Drainage Control ....................................................... <br />i <br />bili <br />S <br />........................83(a) <br />6. Temporary Cessation ............................. .842.11(e) & 816/817.131 2. <br />3 on................................................... <br />zat <br />Surface <br />ta <br />................................... <br />Placement ....................... <br />....................... 83(c) <br />7. <br />8 AML Rec. Fees - Non-Respondent ...... <br />Fees -- Failure to Pay ........... <br />AML Rec .......................... 870. 15(b) <br />..........................870.15(a) . <br />4. .................... ............. <br />Inspections and Certifications..................................... ...................... 83(d) <br />. . 5. Impounding Structures ................................................ ..........................84 <br />B. Hydrologic Balance .......................... ............(816/817.41-57) G. <br />.............................. (816/817.61-68) <br />Use of Explosives.................... <br />1. <br />2. Drainage Control ................................... <br />Inspections & Certifications .................. ......................................45 <br />...........................49(a)(I 0) <br />1. <br />2 <br />Blaster Certification.................................................... <br />.................................... <br />Distance Prohibitions <br />....................... 61(c) <br />....................... 61(4) <br />3. Siltation Structures ................................ ......................................46 <br />47 . <br />3. .............. <br />Blast Survey/Schedule................................................ 62,64 <br />.................... <br />4. Discharge Structures ............................. ...................................... <br />43 4. Warnings & Records .................................................. 6 <br />...:................66 & 68 <br />5. <br />6 Diversions ............................................. <br />Effluent Limits ...................................... ...................................... <br />......................................42 5. Control of Adverse Effects ................... ...................... ............................ 67 <br />. <br />7 . Ground Water Monitoring ..................... .................................41(c) H. Subsidence Control Plan .................................. ....... (817.121-122) <br />8 . Surface Water Monitoring .................... ..................................41(e) I. Roads ................................................................. (816/817.150-151) <br />9 . Drainage--Acid - Toxic Materials ......... ..................................41(f) <br />49 <br />1. <br />Road Construction ...................................................... <br />..................... 150(c) <br />10 <br />11 . Impoundments ............................................................................ <br />. Stream Buffer Zones ....................................................................57 2. <br />3 Certification...................................................................................... 151(a) <br />..............................................................150(b)-151(d) <br />. <br />Drainage <br />. <br />C. Topsoil & Subsoil ...............................................(816/817.22) . <br />4. ............. <br />. <br />. <br />Surfacing and Maintenance ........................................ .......... 150(e)-151(d) <br />1 . Removal .............................. (a) 5. Reclamation ....................... ........................................ ...................... 150(f) <br />2. Substitute Materials .............................. ................................ 22(c) J. Signs & Markers ............................................. .........(816/817.11) <br />3. Storage and Protection ........................... <br />i <br />di <br />ib ..................................22(c) <br />22(d) <br />1. <br />Signs........................................................................... <br />.......... 11(a),(b)-&(c) <br />4. on ........................................ <br />Re <br />str <br />ut .................................. 2. Markers ...................................................................... ll(a),(b),(d)>(e)-&(fl <br />D. Backfilling & Grading ................... ...........(816/817.95-107) K. Distance Prohibitions........................ ...(761.11) <br />1. Exposed Openings.... ..... ...816/817.13, 14, 15; & 823.11 & 21 L. Revegetation .................................................... (816/817.111-116) <br />2. <br />3 Contemporaneous Reclamation ..................................................100 <br />Approximate Original Contour ..........................................102(a)(1) <br />1. <br />Vegetative Cover ....................................................... <br />................ 111 & 116 <br />. <br />4. Highwall Elimination ............................. ............................ 102(a)(2) 2. Timing ........................................................................ ....................... <br />... 113 <br />5. Steep Slopes (includes downslope) ........ ....................................107 M. Postmining Land Use...................................... ........ (816/817.133) <br />6. Handling of Acid & Toxic Materials ...... ................................I02(c) <br />Page 2 of sS, <br />7. Stabilization (rills and gullies) ................ ..................................95(b) Revised December 4, 1998
The URL can be used to link to this page
Your browser does not support the video tag.