Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />3t2t.e r rup-1-2111 t <br />Permittee/Person <br />GRANDE CACHE COAL <br />2. Address <br />P.O. BOX 2827 <br />3. City 4. State <br />Durango CO <br />5. Zip Code 6. Phone Number <br />81302 <br />777777:1 1 (970) 385-4528 <br />7. Operator Name, if Different than Permittee <br />8. Mine Name <br />KING COAL MINE <br />9. Permit Number NOV 0 4 2010 10. Permit Type <br /> C-035-81 Di`JiSI+Jn rrr hw 9t ot1, PP <br />11. Field Visit Date 13. SRA Present <br /> 10/06/2010 Y? <br />mm - dd - yyyy <br />14. Permit Status 15. Site Status 16. Facility Type <br />FA ] FA <br />BEG <br />17. OSM Office # 18. CCID # 19. Land Code <br />l 40 <br />1 <br /> <br />SFI <br />20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> 1 05-00299 CO LA PLATA <br />23 . AVS Permittee Entity ID Number 24. State Office <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />4.0 a. Permit Review Z5 1? A/'_ <br />Signature: Signature: <br />b. Site Visit Time <br />Christine Belka ID # 182 <br />Review Date: lit <br />c. Travel Time: Printed Name: 'i d <br />12.0 <br />mm- dd - yyyy <br />4.0 d. Report Writing Date: 10/15/2010 Is Supplemental MSE Page Used Y/N ? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />0xx ....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 P, joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN.... Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has ggranted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining PI...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or Preparation plant. P2.. Phase II Release: At least Phase II bond release WC.WiIdcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Releas6: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Page I of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). Revised December a, 1998