Laserfiche WebLink
10.) Will any non-portable equipment be used to process the mine material? If so, please <br />indicate the type of structure to be constructed in order to process the material. Indicate <br />the dimensions of the structure(s) (height, length and width) and the type of material the <br />structure(s) will be constructed with. Also, please indicate if a concrete foundation or <br />pad will be constructed to support any structure(s). If so, please indicate the dimensions <br />of the foundations. The Division will need this information to calculate the financial <br />warranty. <br />11.) Will any petroleum products be stored on the site? If so, please indicate how these <br />materials will be stored to prevent and protect against a spill. Indicate the total volume of <br />petroleum stored on site and what type of container will they be stored in (ex 55 U.S. <br />gallon drum). In general, if these materials will be stored,on-site, they should be in a <br />lined berm that can contain 110% of the material stored in the berm. <br />12.) The mining plan indicates a "silt pit" will be constructed at the northeast corner of <br />the permit area. This silt pit must be depicted on the Exhibit C Mining Plan map. Will <br />this pit have exposed ground water? What will be the dimensions of this pit? <br />13.) Will the processing area move from one phase to another as mining progresses, or <br />will it stay in its initial location? <br />14.) Item (e) V outlined in the mining plan indicates after the first four 10 acre phases <br />have been mined, additional 10 acre phases will be plotted within the permit area. Please <br />commit to submitting and obtaining approval from the Division a technical revision to the <br />mining plan to indicate the location of the newly plotted 10 acre phases. <br />6.4.5 EXHIBIT E - Reclamation Plan <br />15.) Item A indicates piles of material (overburden, sand) will be placed into hills or <br />reliefs to benefit wildlife habitat. Please clarify the configuration of these hills. What <br />grade will the slopes of these hills be constructed at? <br />16.) Please provide an estimate of the dimensions/configuration (length, width, height, <br />and side slopes) of the diversion dike described in item (c) of the reclamation Plan. What <br />type of material will this dike be made of? <br />17.) The applicant indicates in item (d) topsoil and overburden piles left in place longer <br />than one growing season will be planted with vegetation to prevent erosion. Please <br />indicate what seed mixture will be used to stabilize these stockpiles. Please indicate the <br />species of grass that will be used and the amount of pure live seeds per acre to be planted <br />for each species chosen. <br />18.) Please state what depth the overburden will be replaced on the site. <br />19.) Please indicate how the seedbed will be prepared for planting?