Laserfiche WebLink
21-Sep-10 Table <br />Land Affected Area <br />rea Summary <br />May Day-Idaho Mine Complex <br />Wildcat Mining Corporation <br />Hesperus, Colorado <br />Total Permit <br />Area 274.7 Acres <br />• <br />• <br /> I:ar(lr Run of tinrfacc Orc Total to <br />Operational Type of <br />Location <br />Lcn'lh (feet) Ulcclc?l NloNin` <br />I ot:il Kline Rode to he Reclaim <br />ommcnt? <br />( <br />Area Disturbance krc3 (Acrexl Disposal rcmoNed for Icuhic <br /> ((chic <br />tiilcc ??' <br />I'rocc??in?''? <br />Nards) <br /> l ardti) <br />Operational Portal Lamb (Bench) N/A 3.14 0 2500 2000 N/A Bench <br />Area <br />Operational <br />Portal May Day 1 <br />N/A <br />3.44 <br />0 <br />1000 <br />0 <br />3500 <br />Bench (150x30x10) <br />Area (Existing) <br />Operational Portal May Day 1 N/A 0.53 0 3500 0 N/A ROM Rock Storage <br />Area (East) <br />Operational Portal May Day 2 N/A 3.31 0 0 2000 N/A Portal Area <br />Area Mine Bench <br />Operational <br />Portal May Day 2 <br />N/A <br />N/A <br />0 <br />1000 <br />0 <br />N/A ROM Rock <br />Area (ROM) Disposal <br />Operational <br />Portal <br />Chief <br />N/A <br />0 <br />30 <br />500 <br />0 <br />0 <br /><500 Includes access <br />Area . road <br />Operational Portal Idaho Mill Site N/A 3.11 0 0 0 N/A See Figure C4 <br />Area <br />Operational Portal PayDay Mill N/A 4.89 0 0 0 N/A See Figure C4 <br />Area Site <br /> Included in Includes Drainage <br />Reclamation Channel Lamb Lamb <.1 100 N/A 0 <100 Channel <br /> Included in <br />Reclamation Channel May Day No.2 May Day No. <br />2 affected <.I 100 N/A 0 <100 Included in May <br />Day No. 2 acreage <br /> lands <br />Pond Augmentation Idaho Mill Site N/A <.1 7000 N/A 2070 7000 Included in Idaho <br /> Pond Mill Site Acreage <br /> <br />Bridge <br />La Plata River Access Road 36 <br /><.1 <br />N/A <br />N/A <br />N/A <br />N/A Included in Road <br /> Bridge Acreage <br /> 50 foot Corridor <br />Roads New Access See Figure C-4 1900 1.76 N/A N/A N/A 2600 includes <br /> Road construction <br /> laydown area <br />Roads Preexisting See Figure C-4 8300 3.81 N/A N/A N/A N/A 20 foot Corridor <br /> Roads <br />Roads Exploration See Figure C-4 7100 1.96 N/A N/A N/A N/A 12 foot Corridor <br />Roads USFS See Figure C4 850 0.39 N/A N/A N/A N/A 20 foot Corr idor <br /> 10,000 sq ft per <br />Drill Pads 11 Pads See Figure C4 N/A 2.53 N/A N/A N/A N/A drill site <br /> 10 foot Corridor to <br />Pipelines Augmentation See Figure C-4 600 0.14 N/A N/A N/A 7000 and from diversion <br /> Pond <br />structure <br /> <br /> Totals 1878x, 29.30 7700 800tr 6070 20100 <br /> 3.6 Miles <br /> 1) Rock Disposal -ROM rock from mining activities <br /> 2) Currently 6070 tons of ore are available on the surface (Idaho Mine, May Day No. 2 and Lamb) <br />Page 1