Laserfiche WebLink
R 21NCORPORATED <br />ENVIRONMENTAL AND ENGINEERING SERVICES <br />STRATEGICALLY POSI'T'IONED-TECHNICALLY PREPARED <br />• <br />MAY DAY IDAHO MINE COMPLEX <br />WILDCAT MINING CORPORATION <br />ORIGINAL 112(d) PERMIT <br />EXHIBIT L <br />Reclamation Costs <br />Rule 6.4.12 <br />• <br />6.4.12 Reclamation Costs <br />ANDREW HARLEY,PH.D <br />GINNY KING <br />Reclamation cost summaries are presented in Table L-1 and L-2. Table L-1 summarizes the key <br />reclamation components of the affected lands including the following: <br />• Operational Area <br />• Drainage Channel Reclamation <br />• Augmentation Pond(including infrastructure <br />• La Plata River Bridge <br />• Roads <br />• Exploration Drill Pads <br />• Augmentation Pond <br />Table L-2 summarizes the estimated reclamation costs for each affected area within the mine permit area. <br />The reclamation cost components are summarized as follows: <br />• New Access Road Reclamation -$40,390.00 <br />• May Day No. 1 Mine Site Reclamation -$26,002.00 <br />• May Day No. 2 Mine Portal and Rock Disposal Site Reclamation-$9,059.00 <br />• Lamb Mine Rock Reclamation -$8,384.00 <br />• Idaho Mine Site Reclamation-Including the Augmentation Pond -$36,918.00 <br />The total reclamation cost including indirect costs is estimated to be $120,753.00 <br />May Day Idaho Mine Complex I I2(d) Permit Application <br />September 21, 2010 <br />"Strategically Positioned - Technically Prepared" <br />5555 DTC Parkway Suite A-4000, Greenwood Village, Colorado 80111 <br />Phone: (303)832-7664, Fax: (303)832-7469 <br />GEORGE M.L. ROBINSON.P.G. <br />J. ERICH RAUBER.P.E.