My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-09-22_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:20 PM
Creation date
9/22/2010 5:00:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/22/2010
Doc Name
Response to Adequacy No. 5
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
PR6
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sandstone removal language has been made to apply to Bench I overburden replaced as <br />the surface spoil as well. <br />43B. The Division requested that plans be provided to address handling of friable shale or claystone <br />dominated deposits in the Bench I overburden, and appropriate plans were provided within <br />amended Subsection 10.1 of Section 2.05.4(2)(d). Resolved. <br />43C. The Division requested that additional narrative detail be provided in Subsection 10.0 to address <br />specific regulatory requirements regarding topsoil and subsoil handling approaches and <br />equipment, measures to avoid excess compaction, and measures to ensure replacement of <br />approximate uniform thicknesses for Bench 1 subsoil substitute, topsoil, and subsoil lifts. <br />Appropriate narrative was provided in amended Subsections 10.0 through 102 to address <br />questions regarding topsoil replacement. Details regarding soil stripping equipment and <br />techniques are still lacking. The appropriate sections to address the methods and equipment used <br />in soil salvage operations would be Section 2.04.9, Subsections 16.4 (for prime farmlands) and <br />16.5 (for non prime farmlands). Please include a detailed description of salvage methods and <br />equipment used in the stripping, loading, and transport of Lift A, Lift B, and mixed lift soils, and <br />Bench 1 overburden to be placed as the surface spoil layer directly beneath the topsoil. <br />A description of the topsoil stripping procedures has been added to Section 2.04.9. <br />NEW ITEMS <br />43D. In the second paragraph of amended Subsection 8.0 of Section 2.05.4(2)(d) revised text there is a <br />typo "land sue', which should be corrected to state "land use ". <br />Text corrected. <br />43E. In the first paragraph of amended Subsection 11.2, reference to Map 2.05.4 -9 appears to be <br />erroneous, correct reference would be Maps 2.05.4 -6 and 2.05.4 -7. <br />Erroneous map reference has been corrected. <br />43F. There is a reference to Pond 13 in Subsection 12. 1.1 under the heading "Lift A Topsoil ", which <br />appears to be erroneous; the discussion is pertinent to the Morgan property and the reference <br />presumably should be to Pond 11. <br />Erroneous Pond 013 references corrected to refer to Pond 011. <br />43G. There is a poorly copied Soil Analysis Report sheet on Attachment page 2.05.4(2)(d) -1 -10 of the <br />"Track Changes" submittal version. The far left and far right sides of the report sheet are "cut <br />off'. Please replace the page with a clean copy that clearly shows the entire report sheet. <br />The cut of sheet has been replaced with the full page. <br />Rule 2.05.4(2)(e) Reveeetation <br />44A. Resolved. <br />44. Subsection 4.0 Revegetation - Reclaimed Irrigated Pastureland (IP) <br />a. Portions of Section 2.05.4(2)(e), Subsection 4.1 were deleted per Division request, due to <br />overlap and inconsistencies with subsequent subsections. Seeding window for IP lands <br />
The URL can be used to link to this page
Your browser does not support the video tag.