Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/10/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: M4 (N410, E6660) (Plate No. 111) <br />Description: Storm drainage from reclaimed area by bypassing WWTP. Drainage reports to stream at energy dissipator. <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br />Preventive <br />Maintenance <br /> <br />Inspections <br /> <br />Spill Prevention <br />C <br />i <br />t <br />t <br />or <br />on <br />a <br />nmen <br />Sediment and Revegetate topsoil. Construct sediment/basin <br />Erosion Control at outfall. Install temporary silt fencing. <br />Management of <br />Runoff <br /> <br />Other Specific <br />i <br />i <br />i <br />es <br />Act <br />v <br />t <br /> <br />E <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).