Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/10/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: M3 (N270, E6870) (Plate No. III) <br />Description: South Storks Interceptor Ditch <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br /> <br />Preventive <br />Maintenance <br />Inspections <br /> <br />Spill Prevention <br />or Containment <br />Sediment and <br />Erosion Control <br />Management of Fill top of dike to provide freeboard and prevent <br />Runoff overtopping from interceptor ditch. <br />Other Specific Remove and replace mining waste with clean <br />Activities material and reseed. 1 E] <br />• <br /> <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).