Laserfiche WebLink
0 0 0 <br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/12/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: N1 (N1960, E81;90) (Plate No. 111) <br />Description: Haul roads on Ceresco Ridge <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br /> <br />Preventive <br />Maintenance <br />Inspections Non-stormwater seepage at toe. Mobilization <br /> of sediment beyond immediate toe of slopes. <br />Spill Prevention <br />or Containment <br />Sediment and <br />Erosion Control <br />Management of Evaluate snowpack in late winter. <br />Runoff <br />Other Specific Redirect drainage to glory hole where practical. <br />Activities <br />11 <br />0 <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).