Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/6/95 By: W. W. Wheeler and Associates, Inc. <br />Key Number: H (14980N, -6040E) (Plate No. 1) <br />Description: Robinson Reservoir spillway discharge into Upper North Interceptor. <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br /> <br />Date By Y/N <br />BMP Actions Required Completion Responsible <br />Good Housekeeping <br /> <br />Preventive <br />Maintenance <br />Inspections <br /> <br />Spill Prevention <br />or Containment <br />Sediment and <br />Erosion Control <br />Management of <br />Runoff <br />Other Specific <br /> <br />1] <br /> <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).