Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.6.11 <br />Date of Identification: 7/6/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: I (area centered 16000N, -5400E) (Plate No. 1) <br />Description: Haul roads for removal of tailing from Dam 4 <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br /> <br />Preventive <br />Maintenance <br />Inspections <br /> <br />Spill Prevention <br />or Containment <br />Sediment and <br />Erosion Control Silt fences along ROW. Minimize cut/fill <br />slopes. Temporary seeding/final reclamation. <br /> Grade haul roads with crown or side slope to <br />facilitate quick drainage from roadway. <br />Management of <br />ff <br />Runo <br />Other Specific Temporary check dams in Upper North Inlet to <br /> trap silt. <br /> <br />• <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).