Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/6/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: G (17400N, -6460E) (Plate No. 1) <br />Description: Lift (pump <br /> <br /> <br />BMP <br />Good Housekeeping ) Station for conveying Dam 4 tailing to Tenmile basin. <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />Actions Required Completion Responsible Date By Y/N <br />Preventive <br />Maintenance <br /> <br />Inspections <br /> <br />Spill Prevention <br />or Containment Provide spill containment sump. <br /> <br />Sediment and <br />E <br />i <br />C <br />l <br />on <br />ros <br />ontro <br />Management of <br />Runoff <br /> <br />Other Specific Remove If not needed. <br /> <br />9 <br />r1 <br />U <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).