Laserfiche WebLink
• • s <br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.6.1) <br />Date of Identification: 7/6/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: C (14660N, -7330E and 14070N, -7240E) (Plate No. 1) <br />Description: Robinson pumps pipeline crossings of Chalk Interceptor. <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP :1E Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br /> <br />Preventive <br />Maintenance <br />Inspections <br /> <br />Spill Prevention <br />or Containment <br />Sediment and <br />Erosion Control <br />Management of <br />Runoff <br />Other Specific Evaluate automatic monitoring of pump opera- <br />Activities tion and discharge using Honeywell system. <br />Consider encasement at crossings. <br /> <br />0 <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).