My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-27_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-08-27_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:20:19 PM
Creation date
8/31/2010 1:52:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
8/27/2010
Doc Name
Colowyo's Response to Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR86
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo's Response: <br />Colowyo has added labels, horizontal stationing and centerline profiles for the <br />runaway ramps illustrated on Map 25C. <br />2. The third paragraph of the Construction report (Page P-1) states that topsoil was <br />"salvaged and stockpiled directly to the west of the haul road footprint prior to <br />commencement of haul road construction." The locations of the topsoil stockpiles <br />are not shown on Map 25C. Please revise Map 25C to identify the sizes and <br />locations of the various topsoil stockpiles developed prior to construction of <br />the South Taylor Haul Road. If the topsoil was placed in an existing topsoil <br />stockpile(s) please include the information on Map 25C and in the <br />construction report. <br />Colowyo's Response: <br />Colowyo has revised Map 25 by adding the shapes and locations of the topsoil <br />stockpiles developed prior to construction of the South Taylor Haul Road. Please see <br />Colowyo 's Annual Reclamation and Hydrology Report for volumes associated with these <br />piles. <br />3. Map 25C provides plan and profile views of the as-built South Taylor Haul Road. <br />Included on the plan is a Typical Haul Road Cross Section. While haul road cross <br />sections are not specifically required by the Rules, the Division requests that <br />Colowyo provide a series of cross sections for the as-built South Taylor Haul <br />Road, created perpendicular to the centerline of the roadway, at 500-ft <br />intervals. <br />Colowyo's Response: <br />Colowyo has provided a second Map 25C that is labeled as South Taylor Haul Road <br />As-Built Cross Sections Sheet 2. This map has eleven (11) cross sections that were <br />created perpendicular to the centerline of the roadway at 500 ft intervals. This map will <br />live behind Map 25C - South Taylor Haul Road As-Built Sheet I in the permit. <br />4. Based on the contours depicted in the plan view on Map-25C, the roadside ditch <br />constructed adjacent to the cut slope side of the South Taylor Haul Road appears <br />to flow uninterrupted (i.e., no cross-culverts diverting the flow eastward beneath <br />the haul road) for its entire length. The ditch eventually reaches a low point, and <br />appears to cross the runaway truck ramp. There is no culvert or crossing <br />indicated on the map where the ditch crosses the runaway truck ramp. Please <br />review the details provided for this location, and ensure that Map 25C <br />reflects the as-built conditions. Please describe how and where water flows <br />from the roadside ditch in the construction notes.
The URL can be used to link to this page
Your browser does not support the video tag.