Laserfiche WebLink
Colowyo's Response: <br />Colowyo has added text to the construction notes, specifically Construction Note <br />#12, located on Map 25C that describes where water flows from the roadside <br />ditch. Colowyo has also added the approximate location of the drainage ditch to <br />Map 25C. <br />This concludes Colowyo's response to the Division's Preliminary Adequacy Review of <br />Technical Revision 86. Included with this revision package are an index sheet and two <br />copies of the amended maps for the Division's ease of incorporation into the permit. You <br />may contact me at 970-824-1578 should you have any additional questions or concerns <br />regarding Colowyo's preliminary adequacy response. <br />Sincerely, <br /> <br />Ryan M. Pawlowski <br />Environmental Engineer <br />cc: File