My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-10-29_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1996-10-29_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:06 PM
Creation date
8/31/2010 11:00:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
10/29/1996
Doc Name
Outlet Works Construction
From
Climax Molybdenum
To
DMG
Type & Sequence
SR2
Email Name
ACS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 125 feet from the original bypass outlet, rather than 50 feet as shown on <br /> the original construction drawings. After removal of the lower 125 feet and approximately <br /> ten feet from the upstream end, approximately 170 lineal feet of buried conduit remained <br /> in place and was subsequently grouted solid. Sheet 2 of the As-Constructed drawings <br /> shows the location of the conduit and filter diaphragm. Bypass conduit examination and <br /> grouting reports are provided in Appendix E. <br /> Elevation-Area-Capacity. Elevation-area-capacity data was determined from original <br /> dam construction drawings from the 1960's. The reservoir will be flight surveyed after the <br /> tailings removal program has been completed. Elevation-area-capacity data will be revised <br /> using the new survey data to reflect actual reservoir conditions. <br /> As-Constructed Documents <br /> The approved design plans for the Eagle Park Reservoir Outlet Works have been <br /> corrected to reflect the As-Constructed conditions. The As-Constructed drawings will be <br /> submitted to the Office of the State Engineer with this completion report. <br /> Certification <br /> The Eagle Park Reservoir Outlet Works Installation was completed substantially in <br /> accordance with the approved design plans and technical specifications. An engineer's <br /> certification statement is enclosed in Appendix A. <br /> Construction Reports <br /> Site visits by Wheeler and Kumar personnel occurred during various stages of <br /> construction. Periodic construction and testing reports were maintained by Wheeler. Daily <br /> construction and testing reports were maintained by Kumar during reconstruction of the <br /> embankment. Copies of the construction reports are enclosed in Appendix C. <br /> Gradation analyses were performed upon two soil samples obtained from the <br /> existing embankment. Moisture-density relationships, bulk specific gravities and <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.