My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C, Triangle Liner Cert.- Apend. D- Tech Specs
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec"e <br />SECTION 01400 .2 GEOSYNTHETIC CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN <br />PART 1: INTRODUCTION <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of the <br />geosynthetic components used for the construction of the valley leach facility at the Cresson Project, Teller <br />County, Colorado. This program has been developed to assure that the construction of the geosynthetic <br />components are in compliance with the project SPECIFICATIONS and to demonstrate that the regulatory <br />requirements for the construction are achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br />followed by the CONTRACTOR and that the intent of the design is met. This program also intends to <br />identify problems that may occur during construction and provide the means for resolution of these <br />problems. <br />This program addresses quality assurance, not quality control. This CQA Plan is independent of the quality <br />control (QC) programs conducted by the MANUFACTURERS, INSTALLERS, and CONTRACTORS. <br />The intent of the CQA Plan is to provide independent third party verification and testing, to demonstrate <br />that the INSTALLER and CONTRACTORS have met their obligations in the supply and installation of <br />geosynthetic materials according to the design, project SPECIFICATIONS, contractual and regulatory <br />requirements. Quality control is provided by the MANUFACTURERS, INSTALLERS, and <br />CONTRACTORS and refers to those actions taken by them to ensure that their materials and workmanship <br />meet the requirements of the plans and project SPECIFICATIONS. <br />PART 2.0 DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA plan including their responsibilities <br />and qualifications. <br />2.01 CC&V: <br />In this CQA Plan CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br />owns and operates the valley leach facility. <br />2.02 MANAGER: <br />In this CQA Plan the MANAGER refers specifically to the individual appointed by the Cripple Creek & <br />Victor Gold Mining Company. The MANAGER is the official representative of CC&V responsible for all <br />construction activities including oversight and direction during construction. The MANAGER is also <br />responsible for coordinating construction and CQA activities for the project. <br />The MANAGER shall serve as communications coordinator for the project initiating preconstruction and <br />resolution meetings. As communications coordinator, the MANAGER shall serve as a liaison between all <br />parties involved in the project to ensure that ongoing communications are maintained. The MANAGER <br />and CERTIFYING ENGINEER shall also be responsible for the resolution of all CQA issues that arise <br />during the installation of the geosynthetics. <br />¦ Duties for this position include the following: <br />' review and approval of design DRAWINGS and project SPECIFICATIONS for all <br />geosynthetic components of the valley leach facility; <br />Section 01400.2 Page 1 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />SAProjects\1125E CCV C:OAU - Tech Specs\01400.2 rt.doc
The URL can be used to link to this page
Your browser does not support the video tag.