My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C, Triangle Liner Cert.- Apend. D- Tech Specs
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecl& <br />w ? u lut'on -ti i . e <br />? <br /> <br /> <br />a <br />Compaction -- 5,000 -- <br />(ASTM D698) <br />Particle Size2 10,000 5,000 20,000 <br />(ASTM C 117, C 136, <br />D 1140) <br /> <br />Atterberg Limit 10,000 5,000 20,000 <br />(ASTM D4318) <br />Moisture Content' 10,000 500 20,000 <br />(ASTM D2216) <br />Permeability4 -- 5,000 -- <br />(ASTM D5084/2434) <br /> <br />Nuclear Density -- 500 -- <br />1. Tests shall be performed at the specified frequency or one per material type, whichever is greater. <br />2. Use the USCS for description and identification (ASTM D2488). <br />3. In-place Moisture Content. <br />4. If the permeability of Soil Liner Fill is higher than 9.0x10-7 cm/sec, an additional permeability test will be <br />performed on a sample located within a 10 foot radius of the sample in question. If the permeability of the <br />Soil Liner Fill is higher than 1.0x10-6 cm/sec, 4 additional samples will be obtained from with 135,000 <br />square foot area centered about the failing test. This testing sequence will be repeated if additional failing <br />permeability tests are measured. <br />*** END OF SECTION *** <br />Section 01400.1 Page 9 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />SAProjects\1125E CCV CQA\I - Tech Specs\01400.I.0.doc
The URL can be used to link to this page
Your browser does not support the video tag.