My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C, Triangle Liner Cert.- Apend. D- Tech Specs
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'e <br />¦ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the design DRAWINGS and project SPECIFICATIONS to <br />ensure that the CQA Plan can be implemented; <br />¦ coordination of all construction activities associated with the various CONTRACTOR(S); <br />¦ scheduling and coordinating construction activities with required CQA testing and activities; <br />¦ overseeing the construction quality control operations performed by the CONTRACTOR(S); <br />¦ approve specific corrective measures to be implemented during construction when deviations <br />from the SPECIFICATIONS occur; <br />¦ ensure that required quality control testing has been performed in accordance with the CQA <br />Plan and to the satisfaction of the CQA Monitor; and <br />¦ ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br />and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan the DESIGN ENGINEER refers specifically to Smith Williams. The DESIGN <br />ENGINEER is the individual or firm responsible for the design and preparation of the project construction <br />DRAWINGS and project SPECIFICATIONS. The DESIGN ENGINEER is responsible for approving all <br />design and project SPECIFICATION changes, modifications, or clarifications encountered during <br />construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). CERTIFYING <br />ENGINEER is the individual or firm responsible for certifying the construction was performed in <br />compliance with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING <br />ENGINEER will be responsible for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the firm or <br />individual responsible for performing the CQA tasks outlined in this plan. The CQA Monitor is the official <br />CQA representative of CC&V and has the responsibility of overseeing the CQA aspects of the project. In <br />this CQA Plan the CQA Monitor is associated with the CERTIFYING ENGINEER and refers specifically <br />to (To Be Determined). The CQA Monitor has the authority to stop any aspect of the work that is not in <br />compliance with the CQA Plan. Work would then be resumed once corrective action has been approved by <br />the MANAGER and CERTIFYING ENGINEER. The specific responsibilities of the CQA Monitor <br />include: <br />¦ review the design DRAWINGS, project SPECIFICATIONS, and related guidance documents; <br />¦ review all CONTRACTOR QC submittals and make appropriate recommendations; <br />¦ observe geosynthetic material delivery, unloading, and storage; <br />¦ obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br />Section 01400.2 Page 2 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />SAProiects\1125E CCV C:QAM -Tech Specs\01400.2 rl.doc
The URL can be used to link to this page
Your browser does not support the video tag.