My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C Triangle Liner Cert.- Cover to Append. C, Weekly Rpts.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 46/C Triangle Liner Certification <br />August 10, 2010 <br />5.0 GEOSYNTHETICS CQC SUBMITTALS <br />Geosynthetics CQC submittals reviewed by AMEC included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, and welding rod certificates. <br />AMEC's inventory control, summarizing CQC certification received for each roll of <br />' geomembrane received, is presented in Appendix G. All geosynthetic material used met project <br />specifications. <br />' 5.1 Geomembrane Installation Personnel Resumes <br />AMEC reviewed the resumes of Lonestar installation personnel to verify that the installation <br />' superintendent and the seaming personnel possessed sufficient experience as required by the <br />project specifications. Review of the installation personnel resumes indicated that key <br />' personnel had experience sufficient to meet or exceed project specifications. Geomembrane <br />personnel resumes are presented in Appendix G-2. <br />5.2 Geomembrane CQC Documents <br />CQC documents submitted by Poly-Flex included resin supplier certificates and geomembrane <br />manufacturer resin certificates, geomembrane roll certificates, and welding rod certificates. <br />AMEC reviewed CQC documents prior to geomembrane placement and verified that the <br />documentation was complete and that the material properties and CQC testing frequency <br />required by specifications were met. <br />5.2.1 Resin CQC Certificates <br />LLDPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br />Chevron Phillips Chemical Company, at a frequency of one per rail car shipment. AMEC <br />reviewed these certificates prior to geomembrane placement. The geomembrane manufacturer <br />also performed density and melt index tests of the resin supplied by Chevron Phillips Chemical <br />Company to verify material properties prior to geomembrane manufacture. The CQC <br />certificates provided by the resin manufacturer are presented in Appendix G-3. <br />5.2.2 Roll CQC Certificates <br />Poly-Flex provided CQC certificates for each roll (approximately every 6900 ft2) of LLDPE <br />' geomembrane used for the project, exceeding the required minimum frequency of one per <br />50,000 square feet of geomembrane. AMEC reviewed the CQC certificates to verify <br />conformance of the geomembrane to the project requirements. Geomembrane was placed only <br />' when complete CQC documentation was provided and AMEC determined that test results met <br />S:\PROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 13
The URL can be used to link to this page
Your browser does not support the video tag.