Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B/C Triangle Liner Certification <br />August 10, 2010 <br />or exceeded project specifications. The geomembrane roll CQC certificates are presented in <br />Appendix G-4. <br />5.2.3 Welding Rod CQC Certificates <br />Welding rod certification consisted of resin CQC documents for the resin used to manufacture <br />the welding material for the Cresson Project. AMEC's review of the CQC certification indicates <br />that the resin used to manufacture the welding material met project specifications. The welding <br />rod CQC certificates are presented in Appendix G-5. <br />S:\PROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 14