Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B/C Triangle Liner Certification <br />August 10, 2010 <br />3.0 GEOSYNTHETICS INSTALLATION <br />Geosynthetics installed in the Phase 46/413 Triangle area consisted of 100-mil single sided <br />texture LLDPE geomembrane. The LLDPE geomembrane was manufactured by Poly-Flex of <br />Grand Prairie, Texas. Geomembrane installation activities included deployment, seaming, and <br />non-destructive and destructive testing of 100-mil single sided texture LLDPE geomembrane. <br />Lonestar installed approximately 8,000 square feet of geomembrane, including geomembrane in <br />' the anchor trench and overlap. <br />' Geomembrane was placed on compacted and approved SLF. Ames anchored geomembrane at <br />the limits of the VLF, where applicable, in an anchor trench a minimum of 3 feet deep by 2 feet <br />' wide. <br /> <br /> <br /> <br />S:\PROJECTS\1125E CCV C0A\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 8