My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C Triangle Liner Cert.- Cover to Append. C, Weekly Rpts.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B/C Triangle Liner Certification <br />August 10, 2010 <br />4.0 EARTHWORK CQA TESTING AND MONITORING <br />The following sections summarize results of the earthwork CQA testing and monitoring <br />performed by AMEC. <br />AMEC conducted CQA testing of earth materials used for construction. Table 3 presents <br />specified and observed CQA testing frequencies. <br />In accordance with the AMEC CQA Plan, when an AMEC monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Ames and/or CC&V. <br />When unsatisfactory test results identified a deficiency, AMEC performed additional tests to <br />define the extent of the deficient area. Ames corrected deficiencies to meet the requirements of <br />the specifications, and AMEC retested and/or approved the corrected deficiency prior to any <br />additional related work <br />4.1 Results of Laboratory Soils Testing <br />AMEC performed laboratory testing of soils during all aspects of the construction. All testing was <br />performed on-site. To verify that the earth materials used during construction met project <br />specifications, AMEC completed the following tests in accordance with the American Society for <br />Testing and Materials (ASTM): <br />¦ Rock corrected density values (ASTM D4718); <br />¦ Grain size distribution (ASTM D1140 for material finer than the No. 200 sieve, and <br />ASTM C117 and C136 for coarse material); <br />¦ Moisture content (ASTM D2216); <br />¦ Atterberg limits (ASTM D4318); <br />¦ Standard Proctor compaction (ASTM D698); <br />¦ Permeability (ASTM D5084, Method D); <br />¦ In-place density testing (ASTM D2922); and <br />¦ Soil description (ASTM D2488) <br />S:\PROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 9
The URL can be used to link to this page
Your browser does not support the video tag.