My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/11/2010 7:29:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 07/18/2010 and 7/25/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adlpt& <br />ame <br />Earth & Environmental <br />2) Drain Cover Fill (DCF) Processing <br />Processing of SLF material continued this week. A CAT 320 excavator, a CAT 330 excavator, <br />a CAT 950 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and <br />process the material. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />DCF Process 7,000 7,000 Estimate from Ames <br />Total 7,000 7,000 Estimate from Ames <br />III) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. Storm water controls are being observed in the East Cresson Clay Borrow. <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued throughout the week, performing <br />deployment, seaming, and repair/QC activities. Geomembrane installation was performed in <br />the area shown on Figure 3. Approximately 83,097 square feet of 100mil LLDPE <br />geomembrane was deployed using a John Deere 200 excavator and a John Deere 544 front-end <br />loader with spreader-bar attachments. Subgrade was inspected and approved by AMEC and <br />Lonestar representatives prior to geomembrane deployment (see Figure 3). Approximately <br />4,569 linear feet of seam was fusion welded during deployment using up to three fusion <br />welding machine. Twelve destructive test samples were marked during fusion seaming. <br />Approximately 201 linear feet of seam was extrusion welded during using up to two extrusion <br />welding machines. Three destructive test samples were marked during extrusion seaming. All <br />destructive sample test results met project specifications. Non-destructive testing was <br />performed for all fusion welded seams. Repairs were performed using the extrusion welding <br />method for all marked defects. Vacuum testing was performed for all extrusion welded seams <br />and repairs. <br />B) Geomembrane Acceptance <br />1) VLF <br />After air testing was performed, the geomembrane in the anchor trench was accepted to allow <br />for backftlling. <br />VLF Weekly Report WE 07.24.10.D
The URL can be used to link to this page
Your browser does not support the video tag.