My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/11/2010 7:29:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 07/18/2010 and 7/25/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />D) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />E) Soil Liner Fill <br />1) VLF <br />Soil liner fill (SLF) placement continued in the areas shown on Figure 2. Subgrade was <br />approved and moisturized prior to placement using a tandem-axle water truck. Placement was <br />performed using two CAT D-6 dozers, and one CAT skid steer loader in a one-foot compacted <br />lift. Moisture conditioning was performed using a tandem-axle water truck and compaction <br />was performed using a 10-ton vibratory smooth drum compactor. Nuclear density testing, <br />moisture verification, and depth checks were performed in the geomembrane deployment areas <br />throughout the week. All test results were within project specifications and all test locations <br />were surveyed by Ames. <br />Soil liner fill material was hauled and stockpiled in temporary stockpiles near stations A26+00 <br />(+/-) and H27+00 (+/-) using CAT 777 and 10 ton articulating haul trucks loaded by a CAT <br />385 excavator. The SLF was hauled from the East Cresson Clay process. <br />F) Low Volume Solution Collection System <br />1) Low Volume Solution Collection Piping <br />No work performed during the week. <br />2) Low Volume Solution Collection Fill (LVSCF) <br />Finishing of the previously placed LVSCF surface was performed using a CAT D-6 LGP dozer <br />and a CAT skid steer loader. LVSCF placement was not performed during the week. <br />G) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT 320 excavator, a CAT 330 excavator, <br />a CAT 950 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and <br />process the material. <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />E Cresson Clay Processing 8,475 193,118 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 8,475 425,522 <br />VLF Weekly Report WE 07.24.10.D
The URL can be used to link to this page
Your browser does not support the video tag.