My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/11/2010 7:29:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 07/18/2010 and 7/25/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />C) Geomembrane Delivery <br />1) VLF <br />No geomembrane delivered to site during the shift. <br />D) Anchor Trench <br />1) VLF <br />Backfilling of the PSSA anchor trench continued between stations E0+00 (+/-) and E3+50 <br />(+/-). The anchor trench was backfilled using a John Deere 35D excavator, a CAT skid steer <br />loader, and laborers. Structural fill (Ore) was moisture conditioned using a tandem axle water <br />truck and placed in the trench in one-foot compacted lifts. Compaction was performed using a <br />vibratory plate compactor. <br />Anchor trench excavation continued between stations E21+50 (+/-) and E23+50 (+/-) using a <br />John Deere 35D excavator. The anchor trench was inspected by an AMEC field representative <br />and was found to be constructed in accordance to the project design and specifications. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC inspected and approved subgrade prior to SLF placement within the Phase 5 VLF. <br />AMEC observed, performed necessary testing, obtained moisture samples, and assisted in the placement <br />and moisture conditioning of SLF material within the Phase 5 VLF. This included the PSSA anchor trench <br />backfill. <br />AMEC inspected and approved subgrade for geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected PSSA anchor trench excavation. <br />AMEC inspected and accepted the PSSA anchor trench for backfill within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of SLF material at the East Cresson Clay <br />Borrow. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 07.24.10.1)
The URL can be used to link to this page
Your browser does not support the video tag.