My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_REVISION - M1977223 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977223
>
2010-07-27_REVISION - M1977223 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:46 PM
Creation date
7/28/2010 11:36:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REVISION
Doc Date
7/27/2010
Doc Name
Water System Improvements
From
JBS Five Rivers Cattle Feeding
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Existing Conditions <br />1. The Contractor takes full responsibility for making him /herself of the conditions of <br />the site prior to construction <br />2. Restore the site to as good or better than original condition prior to construction <br />activities <br />Mit,i .1"t,7,AI11.VA <br />A. The contractor shall provide a warranty of construction as necessary per CDOT and /or <br />Owner requirements <br />Z %WI► —; 0i]i1iL*0 <br />A. Casing pipe, spacers, carrier pipe and casing end seals see Section 331100 for details <br />B. Fill Material <br />1. Use slurry consisting of 1 -1 /4 pounds of Bentonite per gallon of water to fill any <br />minor voids between outside of casing pipe and soil <br />2. Use Portland cement grout slurry to fill any voids that cannot be filled with Bentonite <br />slurry. <br />3. Portland cement grout shall contain fly ash, or other admixtures approved by the <br />Engineer, to retard grout curing until grout has completely filled voids <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Protection <br />1. Provide necessary safety measures for construction activities <br />2. Implement the required traffic control and notification to CDOT by installing the <br />necessary barricades, warning signs, lights etc. <br />3. Identify required lines, levels, contours, and datum <br />4. Locate existing underground structures and utilities in areas of jacking and receiving <br />pits or shafts <br />5. Install dewatering systems for jacking and receiving pits, or shafts <br />6. Dewatering shall meet the requirements of Section 331100 <br />7. Dewater excavations for jacking and receiving pits, or shafts, to a minimum level of <br />three feet below the bottom of excavations for the said pits or shafts <br />B. Surface Preparation <br />1. Per specification Section 312333, Trenching and Backfilling <br />33 05 23.16 - 3 <br />