Weekly Construction Quality Assurance ("CQA") Report: Week of 06/6/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec-O <br />Earth S Environmental <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />Dump 4 LVSCF Processing 23,424 390,451 <br />,n Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. Storm water controls are being observed in the East Cresson Clay Borrow. <br />V) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued throughout the week, performing <br />deployment, seaming, and repair/QC activities. Geomembrane installation was performed in <br />the area shown in Figure 4. Approximately 81,758 square feet of 100mil LLDPE single sided <br />textured and 43,380 square feet of 80mil LLDPE single sided textured was deployed using a <br />John Deere 200 excavator and a John Deere 544 front-end loader with spreader-bar <br />attachments. Subgrade was inspected and approved by AMEC and Lonestar representatives <br />prior to geomembrane deployment (see Figure 4). Approximately 5,155 linear feet of seam was <br />fusion welded during deployment using up to three fusion welding machines. Twelve <br />destructive test samples were marked during seaming. All destructive sample test results met <br />project specifications. Non-destructive testing was performed for all fusion welded seams. <br />Repairs were performed using the extrusion welding method for all marked defects. Vacuum <br />testing, was performed for all extrusion welded repairs. <br />B) Geomembrane Acceptance <br />1) VLF <br />Panels S118 through S215 (secondary- 100mil) were inspected by AMEC and Lonestar <br />representatives, accepting the area shown in Figure 5. <br />VLF Weekly Report WE 06.12.10.D