Laserfiche WebLink
110(2) operations are restricted to producing less than 70,000 tons of mineral, <br />overburden, or combination thereof per calendar year. This limitation on <br />production applies to the entire site, each year. When providing information <br />on production, please specify tonnages of mineral (ore) and overburden (waste <br />rock), or clarify that the quantity includes both mineral and overburden and <br />represents total production. <br />The entire Exhibit C Mine Plan has been revised and inserted in response to adequacv issue 11. <br />Attachment 14 <br />Section 6.3.3(1) (c) of AM-01 states, "Ventilation has been approved by the Mine and <br />Safety and Health Administration and will be implemented in accordance with <br />MSHA criteria and guidelines." As noted previously, please show the underground <br />openings for the ventilation facilities on the maps and discuss these openings in <br />the text. <br />The entire Exhibit C-Mine Plan has been revised and inserted in res once to ade uac issue 11. This <br />specific issue was resolved on pages 2-3 of Exhibit C-Mine Plan. <br />/Attachment 15 <br />Section 6.3.3(1) (f) of AM-01 states, "All areas of disturbances are pre-existing. <br />Approximately 3 acres of the permit area have been disturbed as a result of previously milling <br />and mining activities (Exhibit E-2)." Pursuant to Rules 6.3.3(1) and 6.3.5(2) (f), please outline <br />and label these existing disturbances on the appropriate maps. <br />The entire Exhibit C -Mine Plan has been revised and inserted in response to adequacy issue 11. This <br />specific issue was resolved on page 4 of Exhibit C-Mine Plan. <br />Attachment 16 <br />Please clarify the contradiction between Section 6.3.3(1) (f), which indicates that <br />the three acre area of existing disturbances will not be enlarged, and Section <br />6.3.3(1) (e), which states that the exiting bench at Level 2 will be extended. Please <br />specify the dimension of the extended bench at Level 2 as required by Rule 6.3.3(1) <br />(f)• <br />The entire Exhibit C -Mine Plan has been revised and inserted in response to adequacy issue 11. This <br />specific issue was resolved on page 4 of Exhibit C-Mine Plan. <br />-? Attachment 17 <br />June 28, 2010 Response To DRMS Adequacy Issues May Day Mine and Mill Amendment M-1981-185