My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-25_REVISION - M1986061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2010-06-25_REVISION - M1986061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:15 PM
Creation date
6/29/2010 8:27:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
Revision
Doc Date
6/25/2010
Doc Name
Amendment approval
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
AM2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit or other job action :Amendment AM-2 <br />Task description : Move topsoil from stockpile for spreading <br />HOURLY EQUIPMENT COST <br />Model :Cat 637G <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 740 <br />Ownership cost/hour : $96.37 NA Weight (UST) : 57.38 <br />Operating cost/hour : $150.85 100 Cost data source : (CRG) <br />Operator cost/hour : $24.98 NA <br />Total unit cost/hour : $272.20 Total fleet cost/hour : $272.20 <br />... ........ .. . . . <br />.. . <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 48,000 LCY factor : NA volume : 48,000 LCY <br />Source of quantity take-off :application <br />Source of estimated swell factor : NA <br />......... <br />HOURLY PRODUCTION <br />Hauling Capacity : <br />Basis : <br />Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Dry packed Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds <br />Payload capacity : 29.41 LCY Adjusted capacity : 29.00 LCY *** <br />Cycle Time (load + haul + spread + return) : Loading time : 1.80 minutes <br /> Maneuver and spreading time : 0.60 minutes <br />Travel time : loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 1,000 0.0 5.0 5.0 1,867 0.68 minutes ** <br />Return : 1,000 0.0 5.0 5.0 2,795 0.36 minutes ** <br />" travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 3.44 minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 6,700 Adiusted Hourly Production ; <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 506.31 LCY/Hour*** <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 420.24 LCY/Hour <br /> Adjusted fleet production : 420.24 LCY/Hour <br />Net job correction factor : 0.83 2 times volume on push-pull models <br />_. <br />JOB TIME AND COST .:....:.:..::.. <br />Fleet size : 1 Scraper(s) Total job time : 114.22 Hours <br />Unit cost : $0.648 /LCY Total job cost : $31,091 <br />
The URL can be used to link to this page
Your browser does not support the video tag.