My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-25_REVISION - M1986061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2010-06-25_REVISION - M1986061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:15 PM
Creation date
6/29/2010 8:27:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
Revision
Doc Date
6/25/2010
Doc Name
Amendment approval
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
AM2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit or other job action :Amendment AM-2 <br />Task description : Move overburden to center pivot field <br />HOURLY EQUIPMENT COST <br />Model :Cat 637G Shiftbasis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 740 <br />Ownership cost/hour : $96.37 NA Weight (UST) : 57.38 <br />Operating cost/hour : $150.85 100 Cost data source : (CRG) <br />Operator cost/hour : $24.98 NA <br />Total unit cost/hour : $272.20 Total fleet cost/hour : $272.20 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 133,333 LCY factor : NA volume : 133,333 LCY <br /> <br />Source of quantity take-off : application <br />Source of estimated swell factor: NA <br /> - <br />...:::.. ........... <br />HOURLY PRODUCTION <br />Hauling Caoacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Dry packed Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds <br />Payload capacity : 29.41 LCY Adjusted capacity : 29.00 LCY *** <br /> <br />Cycle Time (load + haul + spread + return) : Loading time : 1.80 minutes <br /> Maneuver and spreading time : 0.60 minutes <br />Travel time : • loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 2,500 0.0 5.0 5.0 1,867 1.48 minutes ** <br />Return : 2,500 0.0 5.0 5.0 2,795 0.89 minutes ** <br />" travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 4.78 minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 6,700 Adjusted Hourly Production ; <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 364.27 LCY/Hour*** <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 302.34 LCY/Hour <br /> Adjusted fleet production : 302.34 LCY/Hour <br />Net job correction factor : 0.83 ' ` 2 times volume on push-pull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 441.00 Hours <br />Unit cost : $0.900 /LCY Total job cost : $120,041
The URL can be used to link to this page
Your browser does not support the video tag.