My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-25_REVISION - M1986061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2010-06-25_REVISION - M1986061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:15 PM
Creation date
6/29/2010 8:27:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
Revision
Doc Date
6/25/2010
Doc Name
Amendment approval
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
AM2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br /> <br />MATERIAL QUANTITIES .... <br />Initial Swell Loose <br />volume : 44,000 LCY factor : NA volume : 44,000 LCY <br /> <br />Source of estimate d volume :application <br />Source of estimated swell factor : NA <br /> <br /> <br />. <br />;... <br />HOURLY PRODUCTION <br />.... ......... <br />.... <br />Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.70 (fnd-mo <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 334.98 LCY/hr <br /> Adjusted fleet production : 334.98 LCY/hr <br /> <br />_.::. <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 131.35 Hours <br />Unit cost : $0.486 /LCY Total job cost : $21,397 <br />
The URL can be used to link to this page
Your browser does not support the video tag.