Laserfiche WebLink
r__ <br />L—A <br />5.0 Wetland Delineation <br />In early October, 2009, Barr Engineering Company (Barr) performed delineation and mapping of <br />wetlands within the ±241 acre RPE East project site in accordance with the U.S. Army Corps of <br />Engineers Wetlands Delineation Manual (1987 Edition) and the Interim Regional Supplement to the <br />Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region <br />(2008). Details of the delineation methodology and wetland descriptions are presented in the Wetland <br />Delineation Report, included here as Appendix I. In general summary, three seepage wetlands were <br />identified and delineated within the project study area. Wetland A is relatively flat herbaceous <br />wetland that occurs on the northeast corner of the property and totals 0.210 acres. Wetlands B and C <br />are very similar steeply - sloped shrub wetlands located in close proximity, near the north - central area <br />of the project site and total 0.026 and 0.036 acres, respectively. No direct, indirect, or secondary <br />wetland impacts are anticipated to occur as a result of refuse pile expansion project activities. <br />PAMpls \06 CO\26 \06261003 MCC Refuse Pile Site Review & Permit \WorkFiles\Permit Application \Text \2010- 04- 19_RPE East Permit Application. doc22 <br />