My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-15_REVISION - C1981038 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2010-06-15_REVISION - C1981038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:13:18 PM
Creation date
6/18/2010 9:33:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
6/15/2010
Doc Name
Letter,Application and Public Notice and Revised Pages
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
PR4
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND ACTIVITIES -- <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />2.05.6 Mitigation of Surface Coal Mining Operation Impacts. (Cont'd.) <br />(3) (b) (iii) (Cont'd.) <br />The operator believes that periodic reevaluation of the groundwater monitoring program is <br />necessary and will report to the Division monitoring results and projected changes to the monitoring <br />program in the "Annual Hydrology, Subsidence, and Mine Inflow Report". The "Annual Hydrology, <br />Subsidence, and Mine Inflow Report" will be submitted to the Division by April 30 of each year. <br />Groundwater monitoring specified in Tables 3 and 4B of Volume 4 will continue until cessation of <br />operations and/or approval of the Division. <br />Post Reclamation Monitoring <br />There were no observed springs or seeps in any of the re-graded areas at the east mine site. There <br />is no reason to believe there will be any saturation of the backfilled wedges. Therefore, the <br />requirement to install piezometers in the backfilled wedges will be deleted from the permit <br />application package. <br />ShOWR on Map 6A 69. One piezemeteF will be IGGated iR the foil wedge abeve the GFUGhing and <br />GGFeening level. Two piezemeteFG will be IOGated in the fill wedge above the shop level. GRe <br />5 . )meteF will be IGGated iR the fill wedge above the paFkqRg level aRd Me piezemeteFG will be <br />.er-,aated- On the fill wedge above the OffiGe level. T-hFee pffiezemeteffi well be leGated MR the fill wedge <br />above the faR level. The piezemeteffi will be OF;6talled thFeughewt the eRtiFe th*GkResr,. of the fill <br />MGROWFiRg is appFeved by the Divisien. if URaGGeptable saturation OGGUFs within any of the foil <br />piezemeteF well GOFnpletA on dmagFaFn us ffesented on Velume 6A, the Phase 11 Study, Gee HyFe <br />Go Rsulting, Plate 6. <br />PR-04 - 124 - 06/10
The URL can be used to link to this page
Your browser does not support the video tag.