My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 5:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Exhibit AL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER - ONLY WORK <br />....... _....___.. __ ._....._. <br />PROJECT IDENTIFICATION � y <br />Distance (feet) <br />Grade.( %) I <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Total res.( %) <br />Task # : 046 State : Colorado Permit/job # C 2006 - 085 <br />Travel time (min.) <br />Date : 0311712010 County : Fremont Abbreviation : none <br />Haul: <br />User: JRS Site : Northfield Mine Filename : C085-046 <br />1.0 <br />Permit or other job action : Technical Revision 1 <br />6.0 <br />1,204 <br />Task description : Replace Topsoil to Facilities A rea <br />minutes <br />Return: <br />1,100 <br />HOURLY EQUIPMENT COST <br />5.0 <br />4.0 <br />Model: Cat 621 G <br />Shift basis: <br />1 per day <br />Cost Breakdown : Job utilization % <br />Horsepower : <br />365 <br />Ownership cost/hour : $55.14 NA <br />Weight (UST) : <br />35.55 <br />Operating cost/hour: $79.09 100 <br />Cost data source: <br />(CRG) <br />Operator cost/hour : $24.98 NA <br />Total unit cost/hour: $ 159:21 Total fleet cost/hour : <br />$159.21 <br />91.88 <br />Hours <br />MATERIAL QUANTITIES <br />Total job cost : <br />$14,628 <br />Initial Swell Loose <br />volume: 17,428 CCY factor : 1.125 volume: <br />19,606 <br />LCY <br />Source of quantity take -off : Page 2.05.4 -7; Map 12 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weight) Basis: <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,550 pounds /LCY <br />Struck volume: <br />14.00 <br />LCY <br />Material description : <br />Heaped volume: <br />21.00 <br />LCY <br />Earth - Dry packed <br />Average volume: <br />17.50 <br />LCY <br />Rated payload: 48;000 pounds <br />Payload capacity: 1 LCY <br />Adjusted capacity : <br />17.50 <br />LCY <br />Cycle Time (load + haul + spread + return) : Loading time: <br />2.00 <br />minutes' <br />Maneuver and spreading time: <br />0.70 <br />minutes <br />Travel time: • loading time per pair on push -pull models <br />Route <br />Distance (feet) <br />Grade.( %) I <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />minutes <br />Haul: <br />1,100 <br />1.0 <br />5.0 <br />6.0 <br />1,204 <br />0.99 <br />minutes <br />Return: <br />1,100 <br />-1.0 <br />5.0 <br />4.0 <br />2,763 <br />0.40 <br />I minutes <br />travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average <br />Total cycle time <br />4.08 <br />minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 5,400 <br />Adjusted Hourly Production <br />Altitude adjustment factor: 1.00 (Cat HB) <br />Unadjusted unit production : <br />257.10 <br />LCY /Hour' "" <br />Job efficiency factor: 0.83 (1 shift/day) <br />Adjusted unit production : <br />213.39 <br />LCY /Hour <br />Adjusted fleet production : <br />213.39 <br />LCY /Hour <br />Net job correction factor: 0.83 <br />""" 2 times volume on push -pull models <br />JOB TIME AN D COST <br />Fleet size: 1 Scraper(s) <br />Total job time : <br />91.88 <br />Hours <br />Unit cost: $0.746 /LCY <br />Total job cost : <br />$14,628 <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.