Laserfiche WebLink
CIRCES Cost Estimating Software <br />cr_aoPFR . nNl Y wnRK <br />PROJECT I DENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 047 State : Colorado Permit/job # C- 2006 -085 <br />Date : 03/17/2010 County Fremont Abbreviation : none <br />User: JRS Site : Northfie Mine Filename : C085 -047 <br />Permit or other job action Technical Revision 1 <br />Task description :Replace Topsoil to Sediment Pond <br />HOURLY EQUIPMENT COST <br />Model Cat 621G <br />Shift basis : 1 per day <br />Cost Breakdown: <br />Distance (feet) <br />Job utilization % <br />Horsepower : <br />365 <br />Ownership cost/hour: <br />$55.14 <br />NA <br />Weight (UST) : <br />35.55 <br />Operating cost/hour : <br />$79.09 <br />100 <br />Cost data source : <br />(CRG) <br />Operator cost/hour: <br />$24.98 <br />NA <br />-1.0 <br />1 5.0 <br />Total unit cost/hour: <br />$159. <br />Total fleet cost/hour : <br />$159.21 <br />Adjusted fleet production : <br />MATERIAL QUANTITIES <br />LCY /Hour <br />Net job correction factor: 0.83 <br />"" 2 times volume on push -pull models <br />Initial <br />Swell <br />Loose <br />volume: 2,859 CCY <br />factor : <br />1.125 volume : <br />3,216 <br />LCY <br />Total job cost : <br />Source of quantity take -off : Page <br />2.05.4 -7; Map 12 <br />Source of estimated swell factor <br />CAT Handbook <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weight) Basis: <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,550 <br />pounds /LCY <br />Struck volume: <br />14.00 <br />LCY <br />Material description : <br />Heaped volume: <br />21.00 <br />LCY <br />Earth - Dry packed <br />Average volume: <br />17.50 <br />LCY <br />Rated payload : 48,000 <br />pounds <br />Payload capacity: 18.82 <br />LCY <br />Adjusted capacity : <br />17.50 <br />LCY "* <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />2.00 <br />minutes' <br />Maneuver and spreading time: <br />0.70 <br />minutes <br />Travel time: <br />• loading time per pair on push -pull models <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />I Travel time (min.) <br />minutes <br />Haul: <br />1,100 <br />1.0 <br />5.0 <br />6.0 <br />1,204 <br />0.99 <br />Iminutes "* <br />Return : <br />1,100 <br />-1.0 <br />1 5.0 <br />4.0 <br />2,763 <br />0.40 <br />I minutes <br />•' travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average <br />Total cycle time <br />4.08 <br />minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,400 <br />Adjusted Hourly Production: <br />Altitude adjustment factor: 1.00 (Cat HB) <br />Unadjusted unit production : <br />257.10 <br />LCY /Hour * ** <br />Job efficiency factor: 0.83 (1 shift/day) <br />Adjusted unit production : <br />213.39 <br />LCY /Hour <br />Adjusted fleet production : <br />213.39 <br />LCY /Hour <br />Net job correction factor: 0.83 <br />"" 2 times volume on push -pull models <br />JOB TIME AND COST <br />Fleet size: 1 Scraper(s) <br />Total job time : <br />15.07 <br />Hours <br />Unit cost : $0.746 /LCY <br />Total job cost : <br />$2,400 <br />