Laserfiche WebLink
CIRCES Cost Estimatina Software <br />cr_ROPFR - ANLY WORK <br />PRO IDENTIFICATION <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Task #: 045 State : Colorado Permit/job # : C 2006 - 085 <br />Date : 03/17/2010 County : Fremont Abbreviation : none <br />User: JRS Site : N orthfield Mine Filename : C085-045 <br />Permit or other job action : Technical Revision 1 <br />Task description :Replace Topsoil to Mine Waste Pile <br />HOURLY EQUIPMENT COST <br />Model: Cat 621 G <br />Shift basis : 1 per day <br />Cost Breakdown : <br />Job utilization % <br />Horsepower : <br />365 <br />Ownership cost/hour: $55.14 <br />NA <br />Weight (UST): <br />minutes <br />Operating cost/hour : $79.09 <br />100 <br />Cost data source : <br />(CRG) <br />Operator cost/hour : $24.98 <br />NA <br />1 1.59 <br />Iminutes *" <br />Total unit cost/hour : $159.2 <br />Total fleet cost/hour : <br />$159.21 <br />5.0 <br />3.0 <br />MAT ER � IAL QUANTITIES <br />1 0.56 <br />minutes <br />Initial Swell <br />Loose <br />LCY /Hour <br />Net job correction factor : 0.83 <br />volume: 4,0 50 CCY factor : <br />1.125 volume: <br />4 ,556 <br />LCY <br />Source of quantity take -off : Page 2.05.4 -7; Map 12 <br />Fleet size : 1 Scraper(s) <br />Source of estimated swell factor CAT Handbook <br />25.33 <br />Hours <br />Unit cost: $0.885 /LCY <br />Total job cost : <br />$4,032 <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weight) Basis: <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,550 pounds /LCY <br />Struck volume: <br />14.00 <br />LCY <br />Material description : <br />Heaped volume: <br />21.00 <br />LCY <br />Earth - Dry packed <br />Average volume: <br />17.50 <br />LCY <br />Rated payload: 48,000 pounds <br />Payload capacity: 18.82 LCY <br />Adjusted capacity : <br />17.50 <br />LCY * ** <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />2.00 <br />minutes <br />Maneuver and spreading time: <br />0.70 <br />minutes <br />Travel time: <br />' loading time per pair on push -pull models <br />• <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />I Travel time (min.) <br />minutes <br />Haul : <br />1,600 <br />2.0 <br />5.0 <br />7.0 <br />1,044 <br />1 1.59 <br />Iminutes *" <br />Retum : <br />1,600 <br />-2.0 <br />5.0 <br />3.0 <br />2,870 <br />1 0.56 <br />minutes <br />travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown not average <br />Total cycle time <br />4.84 <br />minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 5,400 <br />Adjusted Hourly Production : <br />Altitude adjustment factor: 1.00 (Cat HB) <br />Unadjusted unit production : <br />216.75 <br />LCY /Hour * ** <br />Job efficiency factor: 0.83 (1 shift /day) <br />Adjusted unit production : <br />179.90 <br />LCY /Hour <br />Adjusted fleet production : <br />179.90 <br />LCY /Hour <br />Net job correction factor : 0.83 <br />"' 2 times volume on push -pull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) <br />Total job time : <br />25.33 <br />Hours <br />Unit cost: $0.885 /LCY <br />Total job cost : <br />$4,032 <br />A I <br />