Laserfiche WebLink
Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Adjusted unit production : 441.76 LCY /hr <br />Adjusted fleet production : 441.76 LCY /hr <br />Fleet size : <br />Blade type : Semi - Universal <br />Dozers) <br />Total job time : <br />3.24 Hours <br />Attachment no. 1 : ROPS Cab <br />Shift basis : <br />1 per day <br />Total job cost: <br />Attachment no. 2 : -shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown: <br />Ownership cost/hour : $67.77 <br />NA <br />Operating cost/hour : $95.29 <br />100 <br />Ripper op. cost/hour : $0.00 <br />0 <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : <br />$201.60 <br />MATERIAL QUANTITIES <br />>• <br />Initial <br />Swell Loose <br />volume: 1,230 CCY factor : 1.165 volume: <br />1,433 <br />LCY <br />Source of estimated volume: Page 2.05.3 -22, Map 12; Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />. Operator skill : <br />0.75, <br />(avg <br />Average push distance : <br />100 feet <br />Material consistency : <br />0.90 <br />(Cat HB) <br />Unadjusted hourly production : <br />1,243.2 LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description: <br />Job efficiency: <br />0.83 <br />(1shift1day) <br />Compacted fill or embankment <br />Spoil pile: <br />0.80 <br />(fnd -*I) <br />Push gradient: <br />1.00 <br />(Cat HB) <br />Average push gradient: <br />0.00 % (pos) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : <br />5,400 feet <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: <br />2,900 Ibs /LCY <br />Net correction : <br />0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Adjusted unit production : 441.76 LCY /hr <br />Adjusted fleet production : 441.76 LCY /hr <br />Fleet size : <br />1 <br />Dozers) <br />Total job time : <br />3.24 Hours <br />Unit cost: <br />$0.456 <br />/LCY <br />Total job cost: <br />$654 <br />I <br />