Laserfiche WebLink
Blade type Semi - Universal <br />4.05 <br />feet/pass <br />Site altitude : <br />Attachment no. 1 : ROPS Cab <br />feet <br />Shift basis : <br />1 per day <br />Attachment no. 2 I-shank ripper <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />150.00 <br />Data source : <br />(CRG) <br />0.83 <br />Utilization % <br />Average dozer speed: <br />88.00 <br />Cost Breakdown: Ownership cost/hour: $67.87 <br />NA <br />0.83 <br />multiplier <br />Dozer operating cost/hour: $95.29 <br />100 <br />minutes /pass <br />Ripper operating cost/hour: $9.33 <br />100 <br />Production per unit area : <br />0.643 <br />Operator cost/hour : $38.54 <br />NA <br />3,485.54 <br />cu. yds. /hour <br />Total unit cost/hour : $211.04 <br />Total <br />fleet cost/hour: <br />$211.04 <br />MATERIAL QUANTITIES <br />cu. yds. /hour <br />Selected estimating method : <br />g <br />Area <br />Alternate methods - <br />Fleet size : <br />1 <br />Seismic : NA NA Load factor: NA <br />Bank volume: <br />NA <br />BCY <br />Area : 0.22 acres Rip depth (ft) : 2.00 <br />Volume: <br />710 <br />BCY or CCY <br />$43 <br />Source of estimated quantity : Map.12 <br />Source of estimated load factor : <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: <br />Unadjusted production : <br />NA feet/second <br />NA cu. yds. /hour <br />,onaiuun %,orrecuun raciuis - <br />Unadjusted production <br />per selected method : 4,199.44 cu. yds. /hour <br />Area : Avg. ripping depth: <br />4.05 <br />feet/pass <br />Site altitude : <br />5,400 <br />feet <br />Average ripping width: <br />6.08 <br />feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />150.00 <br />feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed: <br />88.00 <br />feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: <br />0.25 <br />minutes /pass <br />Production per unit area : <br />0.643 <br />acres /hour <br />Adjusted unit production : <br />3,485.54 <br />cu. yds. /hour <br />Unadjusted production : <br />4,199.44 <br />cu. yds. /hour <br />Adjusted fleet production : <br />3,485.54 <br />cu. yds. /hour <br />J .. � <br />O B TIME AND COST <br />Fleet size : <br />1 <br />dozer(s) <br />Total job time : <br />0.20 <br />hours <br />Unit cost: <br />$0.061 <br />per cu. yd. <br />Total job cost : <br />$43 <br />II <br />