My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 5:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Exhibit AL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 022 State : Colorado Permit/job # : C- 2006 -085 <br />Date : <br />User: <br />JRS <br />County : Fremont <br />Site : Northfield Mine <br />Abbreviation : none <br />Filename : C085 -022 <br />0311712 <br />Blade type Semi- Universal <br />Attachment no. 1 : ROPS Cab <br />Shift basis: <br />1 per day <br />Attachment no. 2 : <br />-shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown : <br />Ownership cost/hour: <br />$67. <br />NA <br />Dozer operating cost/hour: <br />$95.29 <br />100 <br />Ripper operating cost/hour: <br />$9.33 <br />100 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$211.04 Total fleet cost/hour: <br />$211.04 <br />MATERIAL QUANTITIES <br />ng method : <br />Selected estimating <br />Area <br />Alternate methods - <br />Seismic: NA <br />NA Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 0.38 <br />acres Rip depth (ft) : <br />2.00 Volume: <br />1,226 <br />BCY or CCY <br />Source of estimated quantity : Map 12 <br />Source of estimated load <br />factor :NA <br />__..._. . __,.. ._.... _ <br />_... <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correction Fac - <br />Seismic: Seismic velocity: <br />NA feettsecond <br />Unadjusted production <br />Unadjusted production : <br />NA cu. yds. /hour <br />per selected method : <br />4,199.44 <br />cu. yds. /hour <br />Area : Avg. ripping depth: <br />4.05 feet/pass <br />Site altitude : <br />5,400 <br />feet <br />Average ripping width : <br />6.08 feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />150.00 feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed : <br />88.00 feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: <br />0.25 minutes /pass <br />Production per unit area : <br />0.643 acres /hour <br />Adjusted unit production : <br />3,485.54 <br />cu. yds. /hour <br />Unadjusted production : <br />4,199.44 cu. yds. /hour <br />Adjusted fleet production : <br />3,485.54 <br />cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : <br />1 dozers) <br />Total job time : <br />0.35 <br />hours <br />Unit cost : <br />$0.061 per cu. yd. <br />Total job cost : <br />$74 <br />0311712 <br />
The URL can be used to link to this page
Your browser does not support the video tag.