My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-16_PERMIT FILE - C1996083A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-16_PERMIT FILE - C1996083A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:13 PM
Creation date
6/9/2010 4:48:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/16/2010
Doc Name
pg 2.05-1 to 2.05-58i
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />(4) Ponds, Impoundments and Diversions <br />(a) There will be three sediment ponds constructed for the mine facilities. The ponds <br />are named sediment ponds B, C and D. Sediment pond D will also be referred to as <br />the refuse pile sediment pond. The loadout will have two sediment ponds. The <br />ponds are named sediment ponds J and K. <br />Sediment pond A was deleted from the design. <br />Sediment pond B was relocated below (south of) old State Highway 133 during the <br />construction of the downhill conveyor and highway coal stockpile. It is designed to <br />handle the run -off from B- Gulch. Pond B will be a typical sediment pond, capable of <br />containing the run -off from a 10 -year event with a spillway system designed to <br />handle the peak flow generated by the 25 -year storm event. Dewatering will be <br />through the primary spillway or an optional centrifugal pump. <br />Sediment pond C is located above (north of) the old Bowie railroad grade and is <br />designed to handle the run-off from C- Gulch. Sediment pond C also receives inflow <br />from the mine. A small water treatment building located northwest of Pond C is used <br />to add CDPS approved chemicals to the water as necessary to clarify the water. A <br />sediment pond is to provide adequate capacity to contain or treat the run -off or inflow <br />entering the pond as a result of a 10 -year, 24 -hour precipitation event and any <br />additional storage resulting from the inflow from any underground mine. The <br />calculations presented in Volume III, Exhibit 8, pages 7 and 8, show Pond C has <br />adequate capacity to contain inflow from the mine and the 10 -year, 24 -hour <br />precipitation event. Pond C has and emergency spillway system designed to handle <br />the peak flow generated by the 25 -year storm event. <br />Sediment pond D is the refuse pile sediment pond (also referred to as Pond D). It is <br />designed to handle the run -off from the entire refuse pile area #1, and part of the <br />runoff from refuse pile area #4. See Volume III, Exhibit 8 for details of this sediment <br />pond and associated ditches. <br />Sediment pond J is located south of the tracks below topsoil stockpile F. There is a <br />berm /upper diversion ditch designed to divert upland drainage away from the topsoil <br />stockpile. Pond J is a typical sediment pond, capable of containing the run -off from <br />a 10 -year event with a spillway system designed to handle the peak flow generated <br />by the 25 -year storm event. Dewatering of Pond J will be by pumping. <br />Sediment pond K collects run -off from the batch weigh loadout and surrounding <br />area. Pond K is a typical sediment pond, capable of containing the run -off from a 10- <br />year event with a spillway system designed to handle the peak flow generated by the <br />25 -year storm event. <br />2.05-29- 09/09 <br />7R-6 9 <br />A PPAou'r-D <br />/ 22/2-9/0 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.